BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a bridge / tunnel in Fort Atkinson, Wisconsin. Conceptual plans call for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Work will consist a perpetuation bridge rehabilitation project replacing the existing bridge deck, expansion joints, approach slabs, repair girder ends, surface repair of abutments and reconstruction of the approaches as needed. Bureau of Structures is completing bridge design. 30% design and documents are complete. The concrete deck has numerous signs of deterioration including spalls, delamination, and rust staining. Bridge rehabilitation project- Robert Street Bridge (USH 12) over the Rock River (B-28-0009) in the City of Ft. Atkinson in Jefferson County.The concrete deck of the bridge has numerous signs of deterioration including delamination, spalls, and longitudinal cracking. The concrete bridge rail is cracking with delamination. Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Information on the report may be found at online. ; The contract price will be based on the selected consultants actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Advertised Fixed Fee % 7.25 The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Do not include any information that meets the definition of trade secret as that term is defined in s. 134.90(1)(c), Wis. Stats. Anticipated Construction Cost - $1,000,000-$1,999,999 Solicitation No. SW-06 Project : ROCK RIVER BRIDGE B-28-0009 County : Jefferson The method of contractor selection has not been determined at this time. WisDOT - RFQ Engineering - Bridge Rehabilitation

Conceptual

Bridges / Tunnels

$2,000,000.00

Public - State/Provincial

Paving, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
102
Bidding Soon
1,702
All Active Projects
707
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2020

img_map_placeholder

US-12, Fort Atkinson, WI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.