Site work and new construction of a mixed-use development in Pico Rivera, California. Conceptual plans call for site work for a playground / park / athletic field; for the construction of a stadium; 45,000-square-foot, two-story above grade educational facility; stadium; and educational facility.

As of January 07, 2021, this project has been cancelled. As of October 14, 2020 this project is still On-Hold. It has been on hold since June 2020. As of June 12, 2020, the District has placed this project on indefinite hold. There is a possibility this project will resume moving forward fall 2020. As of April 22, 2029, the construction manager is waiting for School District approval and anticipates news late May or early June 2020 regarding bid results and schedule. This Lease-Leaseback (LLB) Project is Phase 1 of a multi-phase renovation of the existing, occupied El Rancho High School campus. Phase 1 is approximately 17 acres; Plans are divided into two Volumes: Volume 1) New Sports Fields, Stadium with pressbox, modular elevator (Bldg G), track, baseball field, softball field, two new field buildings with team rooms (Buildings E & F), restrooms & concessions and associated Sitework; Volume 2) New two-story 45,000 sf Administration & Classrooms Building (Bldg B) and associated Sitework. Both Volumes are part of this bid package, you are responsible to include all work for your trade scope from both Volumes 1 & 2. We are requesting bids for the Following Trades: Rough & Final Cleaning, AC Paving, Striping, Site Concrete, Fencing & Gates, Synthetic Turf, Synthetic Track, Play-field Equipment & Specialties, Landscaping, Rebar, CIP Concrete, Masonry, Structural Steel, Misc Steel & Handrails, Rough Carpentry, Finish Carpentry & MiIl-work, Waterproofing, Insulation, Metal Wall Panels, Roofing , Sheet Metal, Sealants & Caulking, Doors/Frames/Hardware, Overhead Coiling Doors, Glazing, Plastering, Metal Studs & Drywall, Tile, Acoustical Ceilings, Acoustical Wall Treatment, Flooring, Painting, Marker-boards, Visual Display Boards,Toilet Partitions & Accessories, Signage, Lockers, Fire Extinguishers, Projection Screens, Operable Panel Partitions, Cubicle Curtains, Appliances, Athletic Equipment, Scoreboards, Window Coverings, Bleacher Seating, Elevators, Fire Sprinklers, Plumbing, HVAC, Electrical & Electrical Low Voltage/Fire Alarm/Other Systems. PLEASE NOTE: The Following Trades are already awarded - Surveying & Staking, Erosion Control/SWPPP, Demolition, Abatement, Grading & Earthwork, Site Utilities, Site Electrical Temporary Power and Electrical Safe-off Only.] Project requires Prevailing Wage rates. Project requires Skilled Workforce per State of California requirements. We encourage DVBE Contractors participation. This project has specific goals for Disabled Veteran Business Enterprises, and we look forward to participation at every level for subcontractors, suppliers, materialmen, etc. As a reminder, effective January 1, 2014, Public Contract Code 20111.6 requires all general contractors and all mechanical, electrical, plumbers and site underground subcontractors utilizing any of the following licenses on a Public Works project valued at $1 million or more and funded whole or in part with State Facility Bond funds be prequalified with the District: General Contractors (A & B) and Subcontractors (C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and C-46) You must be prequalified 10 days prior to submitting your bid (last day is February 12, 2020). To prequalify visit www.QualityBidders.com This project is subject to a Community Workforce Agreement (CWA). The goals set forth in the CWA that 30% of the total work hours performed on the project be by "local residents", as defined in the CWA. The District also desires to maximize participation by local, small, emerging, minority and women-owned, disadvantaged, disabled, and veteran (collectively "LSEDV") subcontractors. Overall project duration for El Rancho High School Phase 1 Renovations is from February 26th, 2020 to July 30th, 2022. Requests for Information: Due by February 7, 2020 by 2pm to rsitton@bernards.com Contractor Outreach Event: Monday, February 10th, 2020 at 10am. Meet at the Bernards trailer at parking lot off of Passons Blvd. *Do not contact El Rancho Unified School District. Contacts: Rob Sitton Do not contact El Rancho Unified School District. The construction cost is reportedly $200 million but not yet confirmed by the Construction Manager. The cost of this bid package is not yet confirmed.

Project Abandoned

Educational

$150,000,000.00

Public - City

New Construction, Site Work

605

61

70

2

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
90
Bidding Soon
2,256
All Active Projects
1,006
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2020

January 8, 2021

img_map_placeholder

6501 Passons Blvd, Pico Rivera, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.