BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 19, 2020 at 8:00 PM

Updated November 15, 2023

Site work for a bridge / tunnel in Bruderheim, Alberta. Completed plans call for site work for a bridge / tunnel.

Bridge Culvert Replacement and Other Work Highway 45 - Watercourse Culvert Replacement on Highway 45, 17 km NE of Bruderheim (2054-1) Central Region APPROXIMATE QUANTITIES: 1 Lump Sum Excavation - Structural (B.F. 02054) 1 Lump Sum Excavation - Channel (B.F. 02054) 1 Lump Sum CSP Bevel Ends - Remove and Dispose 34 Metres WSP - Supply (3000 mm dia.) 34 Metres WSP - Install (3000 mm dia.) 1 Lump Sum Backfill - Crushed Aggregate (B.F. 02054) 340 Cubic metres Backfill - Non-Granular (B.F. 02054) 123 Cubic metres Heavy Rock Riprap 750 Square metres Erosion Control Soil Covering - Supply and Install 100 Metres Erosion Control Barrier (Straw Rolls) Contractor to supply all materials.

Award

Bridges / Tunnels

$751,800.00

Public - State/Provincial

Site Work

Subscribe For Documents

84 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
22
Bidding Soon
593
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2020

May 1, 2020

Project location map

AB-45, Bruderheim, AB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.