BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 4, 2020 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Brandon, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

*This project timeline has been extended due to the public health crisis. This Project was originally Scheduled on bid 5/7/2020. Now Bid date changed from 5/14/2020. The work shall consist of construction of a wet detention pond including excavation (12,260 cubic yards), storm sewer (778 linear feet of 42-inch to 12-inch), concrete pavement restoration (149 square yards), erosion controls, and landscaping.

Award

Water / Sewer

$1,586,480.00

Public - City

Paving, Site Work

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
129
Bidding Soon
1,316
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2020

June 15, 2020

Project location map

Multiple Locations, Brandon, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.