Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 20, 2020 at 7:00 PM

Updated October 25, 2024

Site work for a pipeline in Winnipeg, Manitoba. Completed plans call for site work for a pipeline.

The Work to be done under the Contract shall consist of the installation of a landfill gas collection system expansion at the Brady Road Resource Management Facility in Winnipeg, Manitoba. The work generally includes but is not limited to: the drilling, installation and connection of fifteen (15) new dual-purpose vertical landfill gas extraction wells to the existing landfill gas flare system via a network of newly constructed and existing buried HDPE gas collection piping. The work also includes the conversion of all existing single purpose wells to dual purpose, gravity drain traps, buried valve assemblies, retrofits to existing leachate manholes, as well as the supply and installation of a 60 HP compressed air system at the existing flaring compound. The major components of the Work are as follows: Mobilization and startup. Development, implementation, and maintenance of a Site- Specific Health and Safety Plan. Provide construction layout as required. Provision and maintenance of construction facilities and temporary controls. The drilling and installation of fifteen (15) dual-purpose vertical landfill gas extraction wells, and connection to the existing collection system via a network of newly constructed header, lateral and sub-lateral piping. Installation and connection of five (5) monitoring wellheads for gas collection at manholes and future horizontals. Conversion of fifty-seven (57) existing single-purpose wells to dual-purpose. Supply and install compressed air and forcemain piping. Supply and installation of gravity drain traps. Supply and install flow control assemblies. Retrofits to existing manholes, including coring, sealing lids and leachate pump retrofits. Supply and installation of a 60 HP compressed air system within an weatherized enclosure at the flaring compound. Supply and installation of a reinforced concrete slab for the compressed air system. Supply and installation of disconnect switches, power and control wiring from the existing electrical container to the compressed air system. Pressure testing of all installed piping. Final cover repair at all locations affected by the works of this Contract. Landscaping including topsoil, final grading, erosion control blankets and seeding to restore all locations to existing conditions. Demobilization and closeout. Documents are available at https://www.merx4.merx.com/mbgov/cityofwinnipeg

Award

Pipeline

$3,098,822.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
58
Bidding Soon
549
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2020

June 24, 2020

Project location map

To Be Determined, Winnipeg, MB


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed