BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 29, 2024 at 8:00 PM

Updated March 29, 2025

Renovation of a transportation facility in Winnipeg, Manitoba. Completed plans call for the renovation of a transportation facility.

Winnipeg Airports Authority Inc. (WAA) is soliciting Proposals for the provision of Construction Management services to complete the T-187 Combined Services Building (CSB) Interior Renovations, Electrical and Mechanical Upgrades project at 2100 Saskatchewan Avenue, Winnipeg Richardson International Airport. Construction of the Combined Services Building (CSB) interior renovations and upgrades, including site works, demolition, excavation, grading, and structural modifications. Key elements involve installing new high-efficiency electric boilers, electrical upgrades, and reconfiguring the fire truck bay exhaust system to address moisture and leakage issues. Additional work includes structural steel framing, masonry walls, roofing systems, insulation (at and below grade), waterproofing, and fire stopping. Interior renovations will modernize the facility with new finishes such as flooring, gypsum board, ceiling tiles, and painting. All mechanical, electrical, and plumbing systems will be upgraded to meet current standards. 3 Mechanical and electrical upgrades, including airside civil and electrical work within the firehall to ensure efficient operations and minimal disruptions. This includes HVAC system updates, fire suppression systems, electrical distribution enhancements, and emergency power systems, alongside the reconfiguration of the mechanical room and increased electrical capacity to support future upgrades. 4 Groundside work includes site utilities upgrades. The work will focus on maintaining secure and continuous access to the CSB while upgrading utility connections to meet operational needs. .5 Temporary works for construction staging, fencing relocations, final removals, and cleanup. .6 Operations and Maintenance manuals, Commissioning, Training, and building turnover to WAA. Question Deadline 11/12/2024 at 5:00 PM CT Documents are available at https://waa.bonfirehub.ca/opportunities/85923

Post-Bid

Transportation Terminals

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
42
Bidding Soon
545
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2024

April 21, 2025

Project location map

2100 Saskatchewan Ave, Winnipeg, MB


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.