BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Aurora, Colorado. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

As of September 20, 2021, this project is in preliminary design. Information regarding the method of general contractor selection and the construction timeline have not been disclosed. *The closed solicitation has been included below for reference: General Statement of Work: Completion of the NEPA and Preliminary Design tasks to prepare and advance the East Colfax Bus Rapid Transit (BRT) Project (the Project) into the Federal Transit Administration (FTA) Project Development Phase. Planning: o Completion of the FTA National Environmental Policy Act (NEPA) process and approvals; Based on initial evaluation by the FTA it is anticipated that the level of NEPA clearance will be a documented Categorical Exclusion (CATEX) o Support for the City's goal of obtaining an FTA Small Starts Capital Investment Grant (CIG) o Identification of other potential funding opportunities o Development of Preliminary Engineering plans (less than 30% design level) within the NEPA cleared sections and potentially other sections o Implementation of additional planning and outreach requirements as further described below Elevate Denver is a 10-year, $937 million general obligation bond program approved by voters in 2017, that will enhance the City and County of Denver by providing critical improvements to the City's infrastructure - improving our roads, sidewalks, parks, recreation centers, libraries, cultural centers, public-owned buildings and safety facilities. More information can be found at Minority and Women Business Enterprise Participation: 25% M/WBE As the City's best interests may appear, the Manager of the Department of Transportation and Infrastructure reserves the right to waive informalities in, and to reject any or all, proposals The method of contractor selection has not been determined at this time. All questions must be submitted to the administrator in writing by April 23, 2020 at 10:00 a.m. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Conceptual

Roads / Highways

$20,000,000.00

Public - City

Our team is requesting plans for this project.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
38
Bidding Soon
993
All Active Projects
415
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.