BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 22, 2020 at 8:00 PM

Updated November 15, 2023

Site work and renovation of a mixed-use development in Mitchellville, Iowa. Completed plans call for the renovation of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Design and construction of a pre-engineered wooden pole-bam type structure including balance of construction elements such as utilities, concrete placement, demolition and salvage at the Metro Park East Landfill. The pole bam structure will measure a nominal 120’x80’ with 6 overhead doors, stoops, and interior office. All questions (RFI's proposed substitution etc.) are to be submitted to Ben Hayes (Formation Group) no later than May 8th, 2020 by 12:00 PM.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$827,300.00

Public - State/Provincial

Renovation, Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
102
Bidding Soon
1,157
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2020

June 1, 2020

Project location map

12181 NE University Ave, Mitchellville, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.