BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 24, 2025 at 8:00 PM

Updated March 25, 2025

Site work for a water / sewer project in Charlotte, North Carolina. Completed plans call for site work for a water / sewer project.

Construction is complete 960 Zone North South Transmission Main: $26 million The North South Transmission Main is expected to be a new 30,000 foot, 36-inch diameter water main between the existing 48-inch transmission main running along Idlewild Road, north to the Hickory Grove Elevated Storage Tank along Plaza Road Extension. North Tryon Pressure Zone Boundary Change: $19.9 million The North Tryon Pressure Zone Boundary Change will modify the pressure zone boundaries such that the Hidden Valley Neighborhood is served through the 960 pressure zone rather than the 882 pressure zone (current designation). This project will include approximately 23,000 LF of new 8-inch, 16-inch, and 30-inch pipe, 20 new valves, and one emergency check valve connection to the 882 pressure zone. The new transmission main will extend from the end of the North South Transmission Main to connect to an existing main on Old Concord Road. This project needs to be completed concurrently with the 960 Zone North South Transmission Main project. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Occupancy

Water / Sewer

$36,100,000.00

Public - City

Site Work

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
224
Active Projects
136
Bidding Soon
1,650
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2019

March 1, 2024

Project location map

To Be Determined, Charlotte, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.