Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Charlotte, North Carolina. Design plans call for site work for a water / sewer project.
The Idlewild Booster Pump Station Supply Main is expected to be a new 30- and 36-inch diameter water main between the existing 30-inch line at the Craig Avenue Elevated Storage Tank and the intersection of Monroe Road and McMullen Way to a future transmission main which is expected to be installed under a City of Charlotte intersection project. In addition, the Owner reserves the right to add the scope of work for a future transmission main along Monroe Road between McMullen Way and Idlewild Road. This future transmission main is currently part of a Charlotte DOT road improvement project but may be added to the Design-Build Teams scope of work, in the event the intersection project is delayed. As of July 05, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. Charlotte Water is seeking Progressive Design-Build services to assist with the analysis, design and construction for the 960 Zone North South Transmission Main, North Tryon Pressure Zone Boundary Change, Idlewild Booster Pump Station Supply Main, and Airport Area Transmission Main Projects. Proposers need to assemble a team of experts including at a minimum design, survey, geotechnical, environmental, permitting, real estate acquisition including appraisal and legal, and construction contractors. Proposers are put on notice that based on the City's 2017 Disparity Study findings, the City has established a 20% aspirational MWSBE Goal for this project, which includes all development, planning, design, consulting, pre-construction, and construction work, and for any other work, services, and products provided on the Project(s) Prior to City Council's vote to award the contract(s), the City and the successful proposer shall negotiate and agree on the established MWSBE Goals for the Project (collectively, "Subcontracting Goals"). The MWSBE Goals will be established in two phases as follows: o MWSBE Goals for Phase I will include all development, planning, design, consulting and pre-construction work; o MWSBE Goals for Phase II will include all construction work; these goals are typically set at 60%+ design (before construction phase)
Design
Water / Sewer
$8,500,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 26, 2019
March 1, 2024
To Be Determined, Charlotte, NC
Related To This Project
Charlotte, NC
Bid Date: May 23 2022
Charlotte, NC
Bid Date: Sep 01 2022
Charlotte, NC
Bid Date: Aug 11 2022
Charlotte, NC
--
Charlotte, NC
Bid Date: Sep 14 2022
Charlotte, NC
--
Charlotte, NC
--
Charlotte, NC
--
Charlotte, NC
Bid Date: Jun 17 2021
Charlotte, NC
Bid Date: May 27 2021
Charlotte, NC
Bid Date: Sep 27 2022
Charlotte, NC
Bid Date: Sep 27 2022
Charlotte, NC
Bid Date: Sep 20 2022
Charlotte, NC
Bid Date: Apr 07 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.