BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a municipal facility in Naples, Florida. Working plans call for the construction of a municipal facility.

construction of the Domestic Animal Services New Facilities Project MAR Proposal based on Selection Criteria and including Required Forms, completed references, and copies of licenses, E-verify MOU or company profile, sunbiz registration, all as per vendor checklist. Q & A deadline: Dec 07, 2021 3:00:00 PM MST The Construction Manager's work may commence with pre-construction services phase as a part of the comprehensive Construction Manager at Risk contract. Pre-construction services are included with the Construction Manager's responsibilities with the design phase of the Project. Prior to commencing construction of the Project, the Construction Manager will assume the risk of delivering the Project through a GMP contract amendment. The Construction Manager will be responsible for construction means and methods and will be required to solicit bids from qualified subcontractors to perform the work. During the construction phase, the Construction Manager shall be solely responsible for performance of the Project and shall function in the role of an independent General Contractor. That role may include, but not be limited to, the following during each Phase as indicated below. It is anticipated that Collier County will enter into a comprehensive agreement for services with the selected firm to provide the following services: 1.0 The selected Construction Manager will participate in design reviews as the Consultant produces progress sets of plans and specifications. Pre-construction services shall be compensated on a time and material basis utilizing a negotiated fee schedule and negotiated "not-to-exceed" price. Negotiations of the fee schedule shall be based initially upon the rate schedule to be submitted by the proposer in the negotiation process. 2.0 The cost of materials and services during the construction phase will be compensated based on a Guaranteed Maximum Price to be negotiated by the County, or the County's designee, and Construction Manager following substantial completion of design plans and specifications prepared by the Consultant

Final Planning

Municipal

$6,000,000.00

Public - County

New Construction, Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
22
Bidding Soon
411
All Active Projects
162
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2021

February 11, 2022

img_map_placeholder

To Be Determined, Naples, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.