Published July 8, 2024 at 8:00 PM

Updated July 9, 2024

Site work for a civil project in Naples, Florida. Completed plans call for site work for a water / sewer project.

As of July 2024, this project is under construction. This project consists of constructing two new horizontal biologically active pressure filters (BAF) with associated backwash water supply pump, backwash air scour blower, air supply system, lake transfer pump replacement and piping modifications, new underground and above ground piping, fittings, pipe connections, pipe supports, backwash drain pipe and outfall, valves, flow control valves, electrical improvements, electrical switchgear and duct banks, motor controls centers, instrumentation and controls, control panels, communication, miscellaneous sitework, demolition of the existing transfer pump and associated VFDs, demolition of existing motor control centers, demolition of the transformers, demolition of the existing transfer pump disconnects, demolition of the existing underground and above piping. The design of the BAF system allows for future expansion: two additional filters. All new equipment will be installed on a reinforced concrete slab at minimum one foot above the FEMA base floor elevation or as indicated on the drawings. This project is located at the City's Source Water Facility at 7130 N. Collier Blvd, Naples, FL 34114. This project is being bid as a lump sum contract. The contractor is responsible for obtaining the required Collier County permits. The City has obtained the Florida Department of Environmental Protection permit. Owner will reimburse Contractor for County permit fees paid. Question Deadline 10/12/2023 at 5:00 PM ET Answers & Addendum 10/10/2023 5:00 PM Please direct questions to Angela Johenning, Purchasing and Fiscal Analyst at: ajohenning@cityofmarcoisland.com; or (239) 389-5011; or 50 Bald Eagle Drive, Marco Island, Florida 34145. Bid Bond, in an amount not less than 5% of the bidders maximum possible award The undersigned further agrees to substantially complete all work covered by this Proposal within 635 consecutive calendar days, and to fully complete all work in its entirety, including final acceptance, within 665 calendar days from and including the Commencement Date

Under Construction

Water / Sewer

$9,932,000.00

Public - City

Site Work

64

26

14

10

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
67
Bidding Soon
760
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2023

December 4, 2023

Project location map

7130 Collier Blvd, Naples, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.