BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Willcox, Arizona. Working plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.

As per the Owner the project has been cancelled. Editorial Content Team is actively seeking updated information TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE ACCEPTED AFTER 4 P.M. ON NOVEMBER 10, 2022 Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at https://sam.gov Modifications to Bids - Bids may be modified or withdrawn by regular mail, electronic commerce (email) or facsimile, if such notice is received prior to the time specified for receipt of bids. The Government will not be responsible for ANY failure attributable to the transmission or receipt of electronic commerce (email) or facsimile data. For all modifications, we STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total. See FAR Provision 52.214-5, Submission of Bids. Modifications which make the bid ambiguous, indefinite, or uncertain as to any essential requirement of the contract will cause the bid to be rejected as nonresponsive. FAX Number to submit modifications to bids for this project is (720) 963-3360 Email Address to submit modifications to bids for this project is cflcontracts@dot.gov II. POST AWARD INFORMATION CFLHD will no longer be providing paper copies of the conformed contract to the Awarded Prime Contractor. Insurance requirements - See Subsection 107.05 of the FP-14. EEBACS - Contractors shall use the Government's web-based system, Engineer's Estimating, Bidding, Award, and Construction System (EEBACS), to prepare all "Inspector's Daily Record of Construction Operations" (Contractors Daily Reports) and measurement notes (pay notes). The Contractor shall be required to attend a training session on the use of EEBACS. The training session will require up to 4 hours. No more than 3 Contractor staff may attend the training unless approved by the CO. The Contractor shall be responsible for training additional staff. The Contractor shall be required to submit a user account form to gain access to the EEBACS system. See Subsection 108.01. Commencement, Prosecution, and Completion of Work. (APR 1984) Alternate I (APR 1984) The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than {Refer to Subsection 108.01 of the SCRs}. The time stated for completion shall include final cleanup of the premises. The completion date is based on the assumption that the successful offeror will receive the notice to proceed by January 19, 2023. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer. Schedule at least 2 non-work days out of every 14 calendar days. The selected non-work days do not need to be consecutive, but they must be scheduled. Notify the CO at least 2 weeks before changing the scheduled days off. The CO may grant written approval for exemptions to scheduled days off for specific project operations and for periods of limited duration. Add the following: A Notice to Proceed must be issued before commencement of any work. The contract completion date is May 25, 2023. ESTIMATED PRICE: The price range of the project work is between $5,000,000 and $10,000,000. Site Visit (Construction). (FEB 1995) (a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed. B-11 (b) Site visits may be arranged during normal duty hours by contacting: No organized site visit will be held. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project No:AZ FLAP SR181(1), 217-419, HFLCEO220388PR

Final Planning

Roads / Highways

$11,941,016.00

Public - Federal

Paving, Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
2
Bidding Soon
125
All Active Projects
49
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.