Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Madison, Wisconsin. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
After decades of effort, Madison may soon join a $35 million deal with the state and others to improve dangerous highway crossings on the city's Southeast Side. The agreement with the state Department of Transportation, Dane County, the town of Cottage Grove and the Ho-Chunk Nation would create a new diamond interchange with an overpass for County Highway AB at Highway 12-18. The plan is aimed at reducing accidents at two of the most dangerous intersections in the city, as well as improving access to Yahara Hills golf course, Ho-Chunk Gaming Madison and other places. Currently, the intersection of Millpond Road and Highway 12-18 -- with 55 accidents, 17 injuries and one fatality between 2014 and 2018 -- is the second-most dangerous in the city, and the intersection of AB and Highway 12-18 -- with 35 accidents, 19 injuries and one fatality in that span -- is the third-most dangerous. Highway redesign "The Millpond Road and County AB intersections are some of the most dangerous within the city and the state," city transportation director Thomas Lynch said. "This condition has existed for almost 30 years. The city has frequently asked WisDOT to address the high safety concerns that exist at these intersections." The project, funded by federal, state and local sources, would construct the diamond interchange at AB, which would travel over Highway 12-18, Lynch said. It would include frontage roads north and south of Highway 12-18 to serve the county landfill, the golf course and the businesses that surround the Ho-Chunk properties. The interchange would have roundabouts at the ramp terminals and a roundabout to connect the south frontage road to County AB. The proposal includes multi-use paths and bike lanes along connecting roads. The intersection at Millpond Road and Highway 12-18 would then be limited to right turns and prohibit highway crossings. The city's share of the project is estimated to be $5.5 million and would be used for frontage roads to serve city parcels, a fiscal note from the city's Finance Department says. The project is not currently included in the city's nonbinding, five-year Capital Improvement Plan. If adopted, funding would be anticipated in 2022 and paid for with borrowing. The city, meanwhile, will continue to plan for and pursue an overpass at Meier Road and Highway 12-18. If funding is secured, the project would begin in 2022. As of April 29, 2020, this project is in the planning phase. Engineer information has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to May 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Conceptual
Roads / Highways
$35,000,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
June 1, 2022
Multiple Locations, Madison, WI
Related To This Project
Madison, WI
--
Madison, WI
--
Madison, WI
--
Madison, WI
--
Madison, WI
--
Madison, WI
Bid Date: Jan 20 2022
Madison, WI
Bid Date: Dec 16 2021
Madison, WI
Bid Date: Apr 09 2019
Madison, WI
Bid Date: Dec 10 2019
Madison, WI
--
Madison, WI
--
Madison, WI
Bid Date: Nov 19 2020
Madison, WI
--
Madison, WI
Bid Date: Feb 16 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--