BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a medical facility in Houston, Texas. Completed plans call for the renovation of a medical facility.

The purpose of this Contract is for the Contractor to furnish all labor, equipment, materials, and incidentals necessary to modernization of the existing Orange elevators, identified as elevators 1-4, consisting of 3 passenger elevators and 1 freight elevator at Ben Taub Hospital Tower, in the Medical Center, with all the drawings and specifications, all complete, operational and in place in accordance with the drawings and specifications. In the event of conflicts within the construction documents not clarified by addendum, the Contractor shall provide the better quality or greater quantity of work. On projects with contract price of more than $25,000.00, the Contractor shall provide a construction schedule. The construction schedule will be a bar-type schedule and shall be of sufficient detail to show construction sequence for different items of work. On projects with a contract price of $5,000,000.00 or more, the Contractor shall submit a critical path method (CPM) type schedule showing the sequence of installation for the various components of the work. The construction schedule shall be updated by the Contractor whenever the schedule is impacted.

Bid Results

Medical

$958,882.00

Public - City

Renovation

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
346
Active Projects
221
Bidding Soon
4,227
All Active Projects
1,715
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 8, 2020

August 7, 2020

July 3, 2021

img_map_placeholder

1504 Ben Taub Loop, Houston, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.