Site work and paving for a transportation facility in Dulce, New Mexico. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Project Description: The scope of work is comprised of a Base Bid and optional Bid Alternate 1. Base bid includes runway and taxiway pavement rehabilitation, removal of existing pavement underdrains, removal of existing runway lighting and installation of reflective markers, removal and replacement of rotating beacon and wind cone. Bid Alternate 1 includes installation of new runway lighting in lieu of reflective markers, removal and replacement of rotating beacon, REIL's, windcones, and guidance signs. Bidders must also submit their original bid in a sealed envelope via USPS or other mailing service no later than August 3, 2020 to the address below: WHPacific Inc. 6501 Americas Pkwy NE, Suite 400 Albuquerque, New Mexico, 87110 Attn: Jicarilla Apache Nation Airport The bids received will be considered by the Tribal Council at a regular meeting or at a special meeting as may be required. No bid will be considered if received via email after the hour of 2 p.m. (Mountain Time) July 29, 2020 and original bid is received via mailing service after August 3, 2020. Due to public health concerns there will be no Pre-Bid Meeting. Bidders may view the project site, but must obtain permission in advance from Mr. Chris Holyfield, Jicarilla Apache Nation Emergency Manager. Any bidder requesting site access must comply with current public health orders of the State of New Mexico and Jicarilla Apache Nation. Mr. Holyfield may be contacted for health screening and access permission at the following email address or telephone number The work requires the following licenses from New Mexico Construction Industries Division: Runway and Taxiway Construction: GF-1 Fixed Works, Airports or GF-98 Fixed Works, Construct, alter, or repair fixed works facilities. Airfield Electrical: EE-98. Residential and commercial electrical wiring 5000 volts, nominal or less and Electrical distribution and transmission systems over 5000 volts, nominal. Other licenses for major items of work drainage, etc. These licenses will be required at the time bids are opened by any contractor bidding on this work. The procurement code, Sections 13-1-28 through 13-1-199, NMSA 1978 (as amended), imposes civil and criminal penalties for its violation. In addition, the New Mexico Criminal Statutes impose felony penalties for illegal bribes, gratuities and kickbacks. Bidders may view the project site, but must obtain permission in advance from Mr. Chris Holyfield, Jicarilla Apache Nation Emergency Manager. Any bidder requesting site access must comply with current public health orders of the State of New Mexico and Jicarilla Apache Nation. Mr. Holyfield may be contacted for health screening and access permission at the following email address or telephone number. Chris Holyfield, Jicarilla Apache Nation Emergency Manager Email: cholyfield@JAN-RISKMGMT.com Telephone: 575-419-0012 Copies of plans and specifications together with contract documents are available for public inspection and may be viewed or obtained for download or printing at Academy Reprographics Online Planroom, www.academyplans.com. For any questions related to obtaining plans and specifications contact Academy Reprographics 8900 San Mateo Blvd, NE, Albuquerque, NM 87113, telephone (505) 821-6666. Technical questions should be addressed to the engineer of record at WHPacific at 505-247-0294. Each bidder will be required to submit with their bid, a certified check, cashier's check or bid bond in the amount of 5% of their bid, made payable to the Jicarilla Apache Nation. The Tribal Council agrees to carefully canvass and consider each bid submitted. In consideration thereof, no bids may be withdrawn after the scheduled closing time for receipt of bids for at least 90 calendar days. The Tribal Council reserves the right to reject any or all bids, to waive technicalities and to accept the bid of the lowest responsible, responsive bidder it deems to be in the best interest of the Tribe to accept. Minimum wage rates on this project shall be determined by the U.S. Department of Labor Wage Rate Decision No. NM20200037 for each trade or labor classification. The following Federal contract provisions are incorporated by reference, the complete language is contained in the bid documents: Provisions for all Construction Contracts Buy American Preference - Title 49 U.S.C., Chapter 501 o FAA Program Guidance Letter 10-02 "Guidance for Buy American on Airport Improvement Program (AIP) or American Recovery and Reinvestment Act (ARRA) projects." Civil Rights Act of 1964, Title VI - Contractor Contractual Requirements - 49 CFR Part 21 Airport and Airway Improvement Act of 1982, Section 520 - Title 49 U.S.C. 47123 Lobbying and Influencing Federal Employees - 49 CFR Part 20 Access to Records and Reports - 49 CFR Part 18.36 Disadvantaged Business Enterprise - 49 CFR Part 26 Energy Conservation - 49 CFR Part 18.36 Breach of Contract Terms - 49 CFR Part 18.36 Rights to Inventions - 49 CFR Part 18.36 Trade Restriction Clause - 49 CFR Part 30 Veteran's Preference - Title 49 U.S.C 47112 Additional Provisions for Construction Contracts Exceeding $2,000 Davis Bacon Labor Provisions - 29 CFR Part 5 Additional Provisions for Construction Contracts Exceeding $10,000 Equal Opportunity Clause - 41 CFR Part 60-1.4 Certification of Non-Segregated Facilities - 41 CFR Part 60-1.8 Notice of Requirement for Affirmative Action - 41 CFR Part 60-4.2 Equal Employment Opportunity Specification - 41 CFR Part 60-4.3 Termination of Contract - 49 CFR Part 18.36 Additional Provisions for Construction Contracts Exceeding $25,000 Certification Regarding Debarment and Suspension (Non-Procurement) Title 2 CFR Part 180 & Title 2 CFR Part 1200 Additional Provisions for Construction Contracts Exceeding $100,000 Contract Workhours and Safety Standards Act Requirements - 29 CFR Part 5 Clean Air and Water Pollution Control - 49 CFR Part 18.36(i)(12) *This project timeline has been extended due to the public health crisis.

Bid Results

Transportation Terminals

$3,127,499.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
11
Bidding Soon
158
All Active Projects
72
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.