BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Happy Valley, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Proposals received after the time fixed will not be considered. 2020 Pavement Maintenance Program ODOT Class of Work: Asphalt Concrete Paving and Oiling, and Pavement Markings First-Tier Subcontractor Disclosure Form Due Thursday, June 11, 2020 at 4:00 PM This project generally includes reconstruction, repair, and overlay street improvement for eight (8) streets: Proposed work includes the following: Schedule 'A' (SE 129th Avenue) includes the following proposed work: Pavement Grinding to Full-Depth (4"+/-): 724 +/- square yards Cement-Treated Sub-Grade (CTB): 724 +/- square yards (22 tons PCC, 6% Application Rate) Paving Street to 4" Thickness: 724 +/- square yards (160 tons), and Striping: 16+/- square feet of 12" stop bar Schedule 'B' (SE Purple Finch Loop) includes the following proposed work: Pavement Grinding up to 2" Depth: 1,300+/- square yards Overlay Street to 2" Thickness: 2,740+/- square yards (303 tons) Striping: 24+/- square feet of 12" stop bars ADA Ramp Construction: Removal and construction of (4) four ramps Schedule 'C' (SE Solomon Court) includes the following proposed work: o Pavement Grinding to Full-Depth (4"+/-): 3,053+/- square yards Paving Street to 4" Thickness: 3,053+/- square yards (672 tons) Cement-Treated Sub-Grade (CTB): 3,053+/- square yards (93 tons PCC, 6% Application Rate) Striping: 12+/- square feet of 12" stop bar ADA Ramp Construction: Removal and construction of (7) seven ramps Commercial Driveway Construction: Removal and construction of (1) driveway Schedule 'D' (SE Cresthill Road) includes the following proposed work: Pavement Grinding to Full-Depth (4"+/-): 1,094+/- square yards Cement-Treated Sub-Grade (CTB): 1,094+/- square yards (34 tons, 6% Application Rate) Paving Street to 4" Thickness: 1,094+/- square yards (240 tons) Striping: 16+/- square feet of 12" bars ADA Ramp Construction: Removal and construction of (2) two ramps Commercial Driveway Construction: Removal and construction of (1) driveway Schedule 'E' (SE 155th Avenue) includes the following proposed work: Pavement Grinding to Full-Depth (4"+/-): 2,368 +/- square yards Paving Street to 4" Thickness: 2,368 +/- square yards (515 tons) ADA Ramp Construction: Removal and construction of (2) two ramps Concrete Stair Construction: Removal and construction of (1) one stair Striping: 16+/- square feet of 12" stop bar Schedule 'F' (SE 156th Avenue) includes the following proposed work: Pavement Grinding up to 2" Depth: 2,104+/- square yards Overlay Street to 2" Thickness: 2,104+/- square yards (231 tons) Pavement Fabric: 18,936+/- square feet Schedule 'G' (SE Vivian Way) includes the following proposed work: Pavement Grinding up to 2" Depth: 350+/- square yards Overlay Street to 2" Thickness: 350+/- square yards (39 tons) Pavement Fabric: 3,150+/- square feet Schedule 'H' (SE Nyla Way) includes the following proposed work: Pavement Grinding up to 2" Depth: 603+/- square yards Overlay Street to 2" Thickness: 603+/- square yards (67 tons) Striping: 12+/- square feet of 12" bars Pavement Fabric: 5,427+/- square feet ADA Ramp Construction: Removal and construction of (2) two ramps Construction must be completed no later than the Friday, August 28, 2020. Once construction on the project has begun, the contractor must reach substantial completion within 60 days of commencing activity. To perform work, bidders must be prequalified with the Oregon Department of Transportation for the class of work defined above. Proof of prequalification must be submitted to the City by 2:00 PM on the Date of Public Bid Opening. This public works contract is subject to State of Oregon prevailing rates of wage requirements, per ORS 279C.800 through 279C.870. The City will not receive or consider bids unless the bid contains a statement by the bidder that the bidder will comply with ORS 279C.830. Advertised: May 20, 2020, Oregon Daily Journal of Commerce Each Bid Proposal shall be accompanied by a, certified check, cashier check or bid bond (with authorized surety company as surety) made payable to the City of Happy Valley for an amount equal to not less than ten percent (10%) of the total amount of the Bid.

Award

Roads / Highways

$650,947.00

Public - City

Paving, Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
27
Bidding Soon
580
All Active Projects
282
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2020

July 13, 2020

img_map_placeholder

Multiple Locations, Happy Valley, OR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.