Site work and paving for a road / highway in Happy Valley, Oregon. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Proposals received after the time fixed will not be considered. 2021 Street Improvement Project ODOT Class of Work: Asphalt Concrete Paving and Oiling, and Pavement Markings First-Tier Subcontractor Disclosure Form Due Thursday, June 15, 2021 at 4:00 PM The base bid for this project generally includes reconstruction, repair, and overlay street improvement for four (4) streets with a bid alternate for a fifth street: Proposed work includes the following: Schedule 'A' (SE Misty Drive) includes the following proposed work: O Pavement Grinding 1"- 4" depth: 18,037 +/- square yards, O Cement-Treated Sub-Grade (CTB): 1,777 +/- square yards (53 tons PCC, 6% Application Rate), O Overlay Street to 1" Thickness: 3,797 +/- square yards (237 tons), O Paving Street to 5" Thickness: 1,777 +/- square yards (487 tons), and O Striping: 24 +/- square feet of 12" stop bar, 180 +/- square feet of crosswalk, 2,022 +/- lineal feet of 8" white bike lane, 313 +/- lineal feet of 4" white lane line, 1,505 +/- lineal feet of 4" double yellow center line, 4 (four) bike lane symbols and arrows, 10 (ten) turn arrows, O ADA Ramp Construction: Removal and construction of 4 (four) ramps, Schedule 'B' (SE 114th Avenue) includes the following proposed work: O Pavement Grinding to Full-Depth (4"+/-): 1,628+/- square yards, O Cement-Treated Sub-Grade (CTB): 1,628 +/- square yards (49 tons PCC, 6% Application Rate), and O Paving Street to 4" Thickness: 1,628 +/- square yards (350 tons), Schedule 'C' (SE Ridgecrest Road) includes the following proposed work: O Pavement Grinding to Full-Depth (1"+/-): 388 +/- square yards, O Overlay Street to 1" Thickness: 4,479 +/- square yards (278 tons), O Striping: 18 +/- square feet of 12" bars, 140 +/- square feet of crosswalk, 1,857 +/- lineal feet of 8" white bike line, 962 +/- lineal feet of 4" double yellow center line, 6 (six) bike lane symbols and arrows, and O ADA Ramp Construction: Removal and construction of 4 (four) ramps, Schedule 'D' (Stevens Road and Monterey Avenue Roundabout) includes the following proposed work: O Pavement Grinding to Full-Depth (4"+/-): 1,633 +/- square yards, O Cement-Treated Sub-Grade (CTB): 1,633 +/- square yards (49 tons PCC, 6% Application Rate), O Paving Street to 4" Thickness: 1,633 +/- square yards (355 tons), and O Striping: 600 +/- square feet of crosswalk, Bid Alternate (SE Idleman Road) includes the following proposed work: O Pavement Grinding (1"+/-): 1,225 +/- square yards, O Overlay Street to 1" Thickness: 8,625 +/- square yards (537 tons), O 3/4"-0 Aggregate Shoulders, 2" Thickness: 93 +/- tons, O Striping: 5,050+/- lineal feet of 4" white fog line, 361 +/- lineal feet of 8" white bike lane, 2,721 +/- lineal feet of 4" double yellow center line, 94 +/- lineal feet of 4" white skip stripe and 1 (one) bike lane symbol and arrow. Once construction on the project has begun, the contractor must reach substantial completion within 60 days of commencing activity. To perform work, bidders must be prequalified with the Oregon Department of Transportation for the class of work defined above. Proof of prequalification must be submitted to the City by 2:00 PM on the Date of Public Bid Opening. This public works contract is subject to State of Oregon prevailing rates of wage requirements, per ORS 279C.800 through 279C.870. The City will not receive or consider bids unless the bid contains a statement by the bidder that the bidder will comply with ORS 279C.830.

Award

Roads / Highways

$765,515.00

Public - City

Paving, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
64
Bidding Soon
1,061
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2021

July 15, 2021

Project location map

Multiple Locations, Happy Valley, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.