Demolition, site work and new construction of a mixed-use development in Scarborough, Ontario. Completed plans call for the construction of a 45,500-square-foot, two-story above grade, 341-seat educational facility; for site work for a educational facility; 88-seat day care center; and for the demolition of a educational facility.
The Toronto District School Board (the Board) is preparing to construct a mass timber replacement school and childcare at Poplar Road Junior Public School located at 66 Dearham Wood, Scarborough, ON M1E 1S4, hereinafter referred to as the "Project." The Project will include the demolition of the existing school on the site once the new school is constructed. The new building is designed to accommodate a 341-pupil place grade JK-8 school and a childcare center with five program rooms to accommodate 88 children. The total area of the school building is approximately 4,220 m2, of which 3,526 m2 is for the school and 694 m2 for the childcare center. The design emphasizes sustainability, leveraging mass timber for its reduced carbon footprint and aesthetic value. It aligns with modern educational and childcare needs while integrating advanced features to promote energy efficiency. The Project will be phased to allow the existing school to remain operational during the construction of the new school and related site development. New site services, including utilities and infrastructure connections, will be extended to the project location to support the updated facilities. Once the new building is ready for occupancy, the school and childcare will be relocated to the new facility. The existing building will then be demolished, and the remaining site areas redeveloped with updated landscaping and outdoor activity spaces. Detailed phasing constraints and timelines will be provided at a later stage to ensure clarity and coordination by the Construction Manager, with close attention to minimizing disruption to school operations. Moriyama Teshima Architects (MTA) has been retained for full design and contract administration services. By the award date of this RFP, the project will be at the 60-80% contract documents stage, ensuring the selected Construction Manager can contribute meaningful input into the final stages of design. The Project emphasizes collaboration among stakeholders, requiring the Construction Manager to align with the Board's strategic objectives and maintain consistent communication with the Design Team and the Board's Capital Services team. The Board seeks qualified Construction Management firms to submit proposals for pre-construction and construction services for this Project. Firms must demonstrate experience with mass timber construction, phased project delivery, stakeholder collaboration, and innovative project execution strategies. The Contractor shall start the project as soon as possible when the contract is awarded. The successful Contractor shall submit a project schedule to the Board immediately upon award of the Contract. This project shall be substantially completed (all Phases) by: May 30, 2028. Project Schedule: - Construction Manager contract award: June 2025 - Pre-Construction Services commencement : May 2025 - Ministry of Education Approval to Proceed (ATP): Q3 2025 - Notice of Approval Conditions (NOAC): Fall 2025 - Building Permit: December 2025 - Site servicing and enabling works: Fall 2025 - Sub-trade Tendering and TDSB Board Approval: Q1 2026 - Phase 1 Construction commencement: March 2026 - Commissioning and training start: June 2027 - New school Occupancy must be obtained by: August 2027 - Substantial performance of Phase 1 Construction : August 2027 - School Opening: September 2027 - Phase 2 Demolition and Site Redevelopment start: September 2027 - Substantial performance of Phase 2 Demolition and Re-development of Site: May 2028 - Total Completion (All Phases): June 2028 Documents can be obtained at: https://tdsb.bidsandtenders.ca *Awarded project value is undisclosed.
Award
Educational
$28,000,000.00
Public - State/Provincial
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 14, 2025
March 2, 2026
66 Dearham Wood, Scarborough, ON
Related To This Project
Scarborough, ON
Bid Date: Mar 16 2022
Scarborough, ON
--
Scarborough, ON
--
Scarborough, ON
Bid Date: Sep 15 2020
Scarborough, ON
Bid Date: May 04 2022
Scarborough, ON
Bid Date: Jun 27 2018
Scarborough, ON
--
Scarborough, ON
--
Scarborough, ON
--
Scarborough, ON
--
Scarborough, ON
--
Scarborough, ON
Bid Date: May 13 2021
Scarborough, ON
--
Scarborough, ON
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.