BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 21, 2020 at 8:00 PM

Updated January 4, 2025

Site work for an educational facility in Eureka, California. Completed plans call for site work for a educational facility.

** As of 6/30/2020, this project has not yet been awarded. The project is expected to be approved a awarded on July 9, 2020. The work shall include furnishing equipment and staff to excavate soils to lines and grades shown on the plans from the former stadium site at College of the Redwoods, transporting the soil to the White Slough Wetland Enhancement site, and dumping the soil for spreading by US Fish & Wildlife Service staff. The work also includes removal of stumps and debris from the soils to be excavated at the College of the Redwoods site, and hauling off site for appropriate contractor disposal. As an alternative, the contractor may chip stumps and woody debris on site and spread as mulch over the excavated areas. The contractor shall also complete haul route restoration, site stabilization, and installation of temporary and permanent erosion control measures. The US Fish & Wildlife Service has secured required permits for the White Slough site including traffic control plans and encroachment permits for ingress and egress to the White Slough Site. The US Fish & Wildlife Service shall provide traffic control at the White Slough Site. The Contractor is responsible for obtaining a Humboldt County encroachment permit, if required, for access from Tompkins Hill Road to the College of the Redwoods site. The contractor is also required for preparing and implementing a traffic control plan for access to and from the College of the Redwoods site. The Contractor is also responsible for the preparation and management of an appropriate Stormwater Pollution Prevention Plan (SWPPP) for all work completed on the College of the Redwoods site. The Contractor shall comply with the requirements imposed by the California Labor Code Sections 1720 through 1861 regarding public works projects and prevailing wage laws and sections 16000-16800 of the CA Code of Regulations. Each worker needed to execute the work must be paid travel and subsistence payments as defined in the applicable collective bargaining agreements filed in accordance with Labor Code Section 1773.8. Holiday and overtime work when permitted by law shall be paid for at a rate of at least one and one-half times the above specified rate of per diem wages, unless otherwise specified. Contractor and any Subcontractors shall be assessed penalties for violating the following labor codes; CA Labor Code 1813 for overtime, 1775 for underpayment of the prevailing wage, and 1776 for inaccurate or incomplete payroll records. The Contractor shall be responsible for submitting certified payroll records in accordance with Labor Code 1776 and submit copies to Contract Manager's Labor Compliance Officer. No Contractor or Subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].

Award

Educational

$378,000.00

Public - City

Site Work

6

10

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2020

August 1, 2020

Project location map

7531 Tompkins Hill Rd, Eureka, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.