BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Streamwood, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Awarded to Summit Construction not to exceed $50,000. The project consists of the removal of concrete paving and instillation of a permeable paving system. Bid security in the form of a bid bond or certified check made payable to the Board of Library Trustees, of Poplar Creek Public Library equal to 10% of the base bid amount shall be submitted with the bid. Performance and Labor and Material Payment Bonds, and Certificate of Insurance will be required from the successful bidder. The Board of Library Trustees of the Poplar Creek Public Library reserves the right to reject any or all documents submitted or parts thereof, to waive any irregularities or informalities in the prequalification procedures and to approve trade contractors and vendors to bid in a manner serving the interest of the Poplar Creek Public Library. All bidders must comply with the applicable Illinois Law requiring the payment of prevailing wages, and bidders must comply with the Illinois Statutory requirements regarding labor and bidding, including Equal Opportunity Laws.

Award

Roads / Highways

$44,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
101
Bidding Soon
2,060
All Active Projects
893
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2020

August 31, 2020

img_map_placeholder

1405 S Park Ave, Streamwood, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.