BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Glendale, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Glendale Train Station 1st/Last Mile Regional Improvements ProjectThe work shall be done in accordance with Specifications No. 3793 and Plan Nos. 1-3061, 3- 1573, 18-110, 49-245 and C6916, with all appurtenant work as shown on the project plans and specifications, Standard Plans for Public Works Construction (SPPWC 2012 Edition), and the Standard Specifications for Public Works Construction (2018 Edition), including all supplements thereto issued prior to bid opening date. Surface grinding and placement of Asphalt Rubber Hot Mix (ARHM) over Asphalt Concrete Pavement (Leveling Course); Asphalt Concrete Pavement removal and placement of Portland Cement Concrete street section; Application of crack sealing material; Application of emulsion aggregate slurry (Slurry Seal Type II); Selective removal and repair of broken and damaged sidewalk, curb, curb and gutter, cross gutters, alley aprons; Selective removal, repair and reconstruction of concrete street surface on Railroad Street; Modification and reconstruction of existing ramps to meet the current ADA standards; Adjustment of existing manholes and water meters to finished grade; Installation of Bio-Retentions at Intersection of El Bonito/Gardena and Mira Loma/Gardena; Installation of Wayfinding Signs; Installation of Street and Pedestrian Lighting; Installation of Protected Bike-Lanes on Los Feliz Road; Installation of new bus shelters at Glendale Transit Center and intersection of Los Feliz Road and San Fernando Road; Installation of Two-way Opticom Detectors at intersections of San Fernando Road/ Los Feliz Road, San Fernando Road/Central Avenue, San Fernando Road/Cerritos Avenue and Los Feliz Road/Gardena Avenue; Removal and replacement of existing traffic striping and pavement markings; and Planting Trees The Engineer's Estimate for this project is in the range of $3,700,000 and $4,100,000 Bid Bond: 10% of Bid Amount Labor and Materials Bond: 100% of Contract Amount Performance Bond: 100% of Contract Amount

Award

Roads / Highways

$3,400,000.00

Public - City

Paving, Site Work

130

1

2

15

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
103
Bidding Soon
2,208
All Active Projects
959
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2020

November 2, 2020

img_map_placeholder

Multiple Locations, Glendale, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.