Site work for a water / sewer project in Sultan, Washington. Completed plans call for site work for a water / sewer project.

**As of July 21, 2020. Project has been awarded . Bid amount received $1,065,540.40 The estimated cost of construction for the project is between $900,000 and $950,000 which includes the following scope of work: Emergency Repair of Lake 16 Dam including an upstream concrete cutoff trench, permeation grouting, and a downstream graded filter as follows: Enhancements of an existing temporary Supersack dam that currently directs stream flow to the intake structures. Construction of a concrete cutoff trench that extends a minimum of 15 feet beyond the ends of the existing dam and 10 feet below the dam foundation. Permeation grouting to reduce permeability and fill voids upstream of the cutoff trench and around both sides of the new cutoff trench. Construction of a downstream graded filter on both sides of the spillway. All bid proposals shall be accompanied by a bid proposal deposit in certified check, cashiers check or bid bond in an amount equal to five percent (5%) of the amount of such bid proposal. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the City of Sultan. The City retains the right to reject any and all bids and to waive minor irregularities in the bidding process. No bidder may withdraw his bid after the hour set for the opening thereof or before award of contract, unless said award is delayed for a period exceeding sixty (60) days. The City of Sultan is an Equal Opportunity Employer. Contractors/Subcontractors must comply with Executive Order 11246 as amended by Executive Order 11375 regarding affirmative action and equal opportunity. The Contractor, all Subcontractors and Lower Tier Subcontractors will be required to attend a mandatory pre-construction meeting prior to receiving the notice to proceed. This project is subject to State prevailing wage rates.

Award

Water / Sewer

$1,065,541.00

Public - City

Site Work

15

1

6

12

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
1
Bidding Soon
1,059
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.