Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Kalama, Washington. Completed plans call for site work for a water / sewer project.
The Work includes: All labor, materials, tools, equipment, permits, testing, training, and supervision for the installation of all components of the New Visitor Dock & Central Access project as shown in the plans and specifications, generally including: 1. Prepare required submittals and attend required meetings with the Owner and regulatory agencies as required by permits for the project. 2. Prepare dredging work plan for submittal to the agencies. 3. Mobilize to the site. 4. Implement temporary site controls including traffic controls, marine environmental/ water quality controls and temporary erosion and sediment controls (TESC). 5. Dredging and riprap slope protection. 6. Establish temporary connections for utilities (fire line, potable water, sewer) across central access pier to marina floats during construction activities. 7. Demolish and remove existing central access pier, gangways and landing floats. Demolish promenade handrailing at new visitor dock pier location. Relocate piles and hoops as required for new central access configuration. 8. Extract single timber pile at fuel dock and replace with new steel pipe pile. 9. Furnish and install new central access pier, gangways and landing floats. Install new connection for fire line, potable water line and sewer pumpout for service to marina across central access pier and gangways. Install new gate house structure and controls on pier. 10. Furnish and install new visitor dock floats, approach pier, and gangway. Install new fire line, hydrants, life rings and dock ladders on new visitor dock. 11. Furnish and install new lighting and electrical service on new visitor dock. 12. Furnish and install new promenade lighting. 13. Demobilize equipment, labor, temporary facilities and unused materials from the site. 14. Other work required to complete the primary tasks identified above and described in the Contract Documents. For further information contact Darin Sampson, Maintenance Superintendent, Port of Kalama, at (360) 673-2325 or dsampson@portofkalama.com.
Award
Water / Sewer
$2,076,155.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 16, 2020
September 14, 2020
110 W Marine Dr, Kalama, WA
Related To This Project
Kalama, WA
Bid Date: Apr 29 2020
Kalama, WA
Bid Date: Apr 14 2023
Kalama, WA
Bid Date: Apr 14 2023
Kalama, WA
Bid Date: Apr 17 2023
Kalama, WA
Bid Date: May 12 2023
Kalama, WA
Bid Date: Apr 05 2024
Kalama, WA
Bid Date: Apr 20 2021
Kalama, WA
--
Kalama, WA
Bid Date: Apr 06 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.