BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 19, 2020 at 8:00 PM

Updated November 13, 2025

Site work for a water / sewer project in Tifton, Georgia. Completed plans call for site work for a water / sewer project.

"**As of August 19, 2020, the project has been awarded for $924,531.15.** For Lamb Loop Street and Drainage Improvements The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Lamb Loop Street & Drainage Improvements to serve the CCBCU Distribution Center as shown on the construction drawings. In general, construction consists of widening the existing two lane rural ditch section of roadway to a widened two lane curb and gutter roadway beginning and ending at intersections with U.S. Highway 41/S.R. 7 for a distance of approximately 0.50 miles. This work will be awarded in one (1) contract with a 120 consecutive calendar day construction schedule.

Award

Water / Sewer

$924,531.00

Public - County

Site Work

23

1

6

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
31
Bidding Soon
546
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 13, 2020

August 12, 2020

Project location map

Lamb Loop, Tifton, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.