BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Perry, Georgia. Completed plans call for site work for a water / sewer project.

The work to be performed and provided under this Contract shall consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures, taxes, profit, overhead, and other costs and effort required to complete the following: Installation of approximately 2,500 L.F. of 15" - 30" storm drain piping and associated drainage structures, ditch improvements, storm pond improvements and all related work. The time allotted for final completion of work is 180 consecutive calendar days. Contractor will be required to coordinate all work with the City of Perry and other utility owners who have facilities within the project corridor. The project will be managed by GWES, LLC. located at 733 Carroll Street, Perry, GA 31069, telephone number (478) 235-0307. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. The Bidder shall affix to the outside of its Bid envelope, its Georgia Utility Contractor License Number, not the license number of a Utility manager or a subcontractor's Georgia Utility Contractor License Number. No bid will be opened unless the Contractor's Utility License Number is affixed to the envelope. Each Bid must be accompanied by a Bid Bond or certified cashier's check, in the amount of 10% of the base bid, prepared on the form of Bid Bond, section 00410, attached to the Contract Documents or a Surety Company's Standard Bid Bond, duly executed by the Bidder as principal and having as surety thereon a surety company licensed to do business in the State of Georgia and listed in the latest issue of U.S. Treasury Circular 570 with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". Each Bond shall be accompanied by a "Power of Attorney" empowering the attorney-in-fact to bind the surety and certified to include the date of the bond. MBE (27.5%), WBE (6.9%)

Award

Water / Sewer

$480,408.00

Public - City

Site Work

31

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
31
Bidding Soon
384
All Active Projects
152
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2021

February 22, 2021

img_map_placeholder

Multiple Locations, Perry, GA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.