BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 19, 2020 at 8:00 PM

Updated April 16, 2025

Site work for a water / sewer project in San Antonio, Texas. Completed plans call for site work for a water / sewer project.

Sealed proposals are requested by the San Antonio Water System for the construction of various improvements for the West Ave. Elevated Storage Tank Painting and Rehabilitation Project, SAWS Job No.18-0110. The improvements include: Rehabilitation of a 500,000 gallon welded steel, elevated storage tank, including the surface preparation and repainting of the interior and exterior surfaces; replacement of specified tank appurtenances; surface preparation and painting of a well pump and piping assembly; site grading and paving; chlorine system upgrades; site fencing improvements; yard piping; a new shade canopy; electrical equipment including conductors, control panels, generator connections, permanent generator and SCADA controls; demolition of existing vaults, electrical equipment and other miscellaneous work for a complete in place facility. See the Electronic Bid Opening Instructions attachment for additional information regarding an electronic bid submittal. Electronic bids shall be accompanied by a bid bond in an amount not less than five percent of the total bid price. (Or, if providing SAWS with a cashier's check or certified check in an amount not less than five percent of the total bid price, SAWS will request this within 24 hours from the apparent low bidder. Sealed bids must be accompanied by a cashier's check, certified check, or bid bond in an amount not less than five percent of the total bid price. Bids will then be publicly opened and read aloud by Contract Administration via WebEx. For questions regarding this solicitation, technical questions or additional information, please contact Stella Manzello, Contract Administrator, in writing via email to: Stella.Manzello@saws.org or by fax to (210) 233-4290 until 4:00 PM (CT) on July 31, 2020. Answers to the questions will be posted to the web site by 10:00 SM (CT) on August 5, 2020 as a separate document or included as part of an addendum. Please be advised that firms responding to this RFCSP (Respondents) are prohibited from communicating with any other SAWS staff, the Consultant, the Developer, or COSA officials regarding this RFCSP up until the contract is awarded as outlined in the Instructions to Respondents. SMWVB goal is 20% - Elevated Storage Tank Rehabilitation o Class 1 Containment Required o Lead Paint Removal -Yard Piping Replacement - Site Improvements - Chemical System Upgrades - Electrical System Upgrades

Post-Bid

Water / Sewer

$2,759,943.00

Public - City

Site Work

77

1

39

4

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
264
Active Projects
122
Bidding Soon
2,251
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2020

October 12, 2020

Project location map

West Ave, San Antonio, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.