BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 8, 2022 at 8:00 PM

Updated September 14, 2023

Demolition, site work, renovation and addition to a fire / police facility in Peoria, Arizona. Conceptual plans call for the demolition of a fire / police facility; for site work for a fire / police facility; for the addition of a fire / police facility; and for the renovation of a fire / police facility.

This project entails a renovation and expansion of the Fire Department portion of the Pinnacle Peak Public Safety Facility (PPPSF). Improvements will include a detached bay for ambulance or low acuity apparatus, additional dorms and restrooms, reconfiguration of the public lobby for secure access to the Police department, interior painting, and a refresh of living environment appurtenances. Site security fencing and gates to protect the existing apparatus bay will be explored. Total capital costs include design, construction, administrative fees, furniture fixtures and equipment, and information technology costs. The project is included in the City of Peoria's 2023-2032 Capital Improvement Program (CIP). As July 8, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Fire / Police

$2,591,845.00

Public - City

Addition, Demolition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
43
Bidding Soon
1,176
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.