Site work for a mixed-use development in Texas City, Texas. Working plans call for site work for a sidewalk / parking lot; and water / sewer project.

PRESOLICITATION NOTICE For W912HY22R0008 Texas City I Wall Replacement The U.S. Army Corps of Engineers - Galveston District has been tasked to solicit and award a Construction Contract under Full and Open Competition for the demolition and replacement of the Texas City I Wall located in Texas City, Texas. The proposed project will result in a firm-fixed price contract. The government intends to issue an UNRESTRICTED- Request for Proposal (RFP) solicitation utilizing Lowest Priced Technically Acceptable Source Selection Procedures. The Evaluation Factors will be identified in the RFP. Project Information: 1. General Description: The project includes the demolition of approximately 600 linear feet of existing 18" and 24" thick concrete I-Wall, including a vehicle access gate and pedestrian gate. Demolition also includes the removal and/or cut-off of numerous 30" diameter steel soldier piles; existing drainage and water lines; and other existing features in direct conflict with construction. The I-Wall will be replaced with a 15-foot-high concrete inverted T-Wall, consisting of approximately 15,000 linear feet of steel H-piles, a sheet pile cut-off wall, approximately 6 feet of excavation and miscellaneous earthwork, and new vehicular and pedestrian access gates. The project also includes the placement of Temporary Flood Protection, a concrete scour pad on the flood side, and a new drainage system on the protected side. The work area is within an active chemical refinery and the contractor will be required to provide security personnel to meet Maritime Security (MARSEC) requirements. Additionally, vibration monitoring will be required. Hot work permits must be obtained daily from the site representatives, and no work permits will be granted on days a ship or barge is loading at Dock #1. The contractor must always maintain access to Dock #1, therefore, construction sequencing has been determined. 2. Completion Time: The contractor shall complete the entire work not later than 730 calendar days after the date the contractor receives the Notice to Proceed. If the contractor fails to complete the work within the time specified, the contractor shall pay liquidated damages to the Government in the amount of $3,785.00 for each calendar day of delay until the work is completed or accepted. 3. Estimated magnitude for this effort is between $10,000,000 and $25,000,000. 4. NAICS Code 237990, Other Heavy and Civil Engineering Construction. 5. SB Size Standard is $36.5M. 6. PSC Code: Y1KZ Construction of Other conservation and development facilities 7. Bonding Requirements: The Contractor will be required to provide the Performance and Payment Bonds within 3 calendar day after award. The contractor shall begin work within 10 calendar days after acknowledgement of the Notice to Proceed. 8. Applicable to Large Businesses: Large Business firms will be required to submit a Small Business (SB) Subcontracting Plan with their initial proposal in accordance with FAR 52.219-9 Alt II. The Galveston District SB Subcontracting Goals for this contract are as follows: Small Business: {23%} of the total contract value. Small Disadvantaged Business (SDB): {5%} of the total contract value; Woman-Owned Small Business (WOSB): {5%} of the total contract value; Historically Underutilized Business Zone (HUBZone) Small Business: {3%} of the total contract value; Veteran Owned Small Business (VOSB): {3%} of the total contract value; Service Disabled Veteran Owned Small Business (SDVOSB): {3%} of the total contract value; Historically Black Colleges and Universities and Minority Institutions (HBCU/MI) {0%} 9. Anticipated solicitation issuance date is on or about August 2022 and the estimated proposal due date will be on or about September 2022 at 2:00 pm (DST) The solicitation plans, and specs will be issued on PIEE.gov and inviting firms to register electronically to receive a copy of the solicitation when it is issued. It is recommended that potential offers seeking to do business with the US Army Corps of Engineers (USACE) Southwestern Division complete a vendor registration in SAM.gov and https://piee.eb.mil/ , as you will be required to submit an electronic bid/offer submission through the PIEE Solicitation Module. Proposals submitted by mail or hand-carried will not be evaluated. Proposals sent through proprietary or third-party File Transfer Protocol (FTP) sites or DoD SAFE will not be retrieved. It is the responsibility of the Offeror to confirm receipt of proposals. All proposals received after the exact time specified for receipt shall be treated as late submissions and will not be considered except under facts and circumstances allowed by the Federal Acquisition Regulation (FAR). For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. It is the Offeror's responsibility to obtain written confirmation of receipt of all electronic files of the full proposal by the USACE SWG District Contracting office. If the Solicitation Module is not operational, the alternate method for proposal submission is via email to the email address noted on Block 10 of the front of the SF1442 ONLY. The Offeror must obtain prior approval from the Contracting Officer to use the alternate submission method. Offerors are responsible for ensuring electronic copies are virus-free and shall run an anti-virus scan before submission. Electronic files shall be clearly identified with the Solicitation Number and for each volume, section, and item. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Sidewalks / Parking Lot

$25,000,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
52
Bidding Soon
2,615
All Active Projects
1,008
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2022

img_map_placeholder

Multiple Locations, Texas City, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.