Site work for a water / sewer project in El Paso, Texas. Completed plans call for site work for a water / sewer project.

Works to be provided for this project shall be for furnishing all labor, materials, transportation, and services for the construction and installation as follows: Nevins Reservoir: Furnish and install a packed tower air stripper rated to treat a minimum of 800 gallons per minute of water while reducing the TTHM's in the water by 98% or more. The project includes 8-inch diameter piping and isolation valves to connect the packed tower skid to the tank inlet and the pump station suction line. The project will require a new electric service to power the packed tower system. The packed tower skid shall be integrated into the onsite SCADA system that communicates with central control. The contractor shall provide a two channel THM-100 analyzer system by Aqua Metrology Systems to monitor the inlet and outlet concentrations to the packed tower. The final product shall be a complete and in-place THM monitoring and reduction system including all components and appurtenances. Crown Point II Reservoir: Furnish and install a packed tower air stripper rated to treat a minimum of 800 gallons per minute of water while reducing the TTHM's in the water by 98% or more. The project includes 8-inch diameter piping and isolation valves to connect the packed tower skid to the tank inlet and the pump station suction line. This site will require the contractor to install a new outlet to the existing steel tank. This outlet will be connected to the inlet side of the packed tower skid. The packed tower skid shall be integrated into the onsite SCADA system that communicates with central control. The contractor shall provide a two channel THM-100 analyzer system by Aqua Metrology Systems to monitor the inlet and outlet concentrations to the packed tower. The final product shall be a complete and in-place THM monitoring and reduction system including all components and appurtenances For additional information, submit your inquiry to the Purchasing / Contracts email address: Purchasing.Info@epwater.org. Engineer Estimate: $2,263,815.75 - $1,832,612.75

Award

Water / Sewer

$2,621,266.00

Public - City

Site Work

16

15

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
7
Bidding Soon
248
All Active Projects
110
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2022

October 17, 2022

img_map_placeholder

To Be Determined, El Paso, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.