Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 24, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in El Paso, Texas. Completed plans call for site work for a water / sewer project.

Works to be provided for this project shall be for furnishing all labor, materials, transportation, and services for the construction and installation as follows: Nevins Reservoir: Furnish and install a packed tower air stripper rated to treat a minimum of 800 gallons per minute of water while reducing the TTHM's in the water by 98% or more. The project includes 8-inch diameter piping and isolation valves to connect the packed tower skid to the tank inlet and the pump station suction line. The project will require a new electric service to power the packed tower system. The packed tower skid shall be integrated into the onsite SCADA system that communicates with central control. The contractor shall provide a two channel THM-100 analyzer system by Aqua Metrology Systems to monitor the inlet and outlet concentrations to the packed tower. The final product shall be a complete and in-place THM monitoring and reduction system including all components and appurtenances. Crown Point II Reservoir: Furnish and install a packed tower air stripper rated to treat a minimum of 800 gallons per minute of water while reducing the TTHM's in the water by 98% or more. The project includes 8-inch diameter piping and isolation valves to connect the packed tower skid to the tank inlet and the pump station suction line. This site will require the contractor to install a new outlet to the existing steel tank. This outlet will be connected to the inlet side of the packed tower skid. The packed tower skid shall be integrated into the onsite SCADA system that communicates with central control. The contractor shall provide a two channel THM-100 analyzer system by Aqua Metrology Systems to monitor the inlet and outlet concentrations to the packed tower. The final product shall be a complete and in-place THM monitoring and reduction system including all components and appurtenances For additional information, submit your inquiry to the Purchasing / Contracts email address: Purchasing.Info@epwater.org. Engineer Estimate: $2,263,815.75 - $1,832,612.75

Award

Water / Sewer

$2,621,266.00

Public - City

Site Work

16

15

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
18
Bidding Soon
403
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2022

October 17, 2022

Project location map

To Be Determined, El Paso, TX

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed