Published September 9, 2020 at 8:00 PM

Updated October 1, 2024

Site work and paving for a bridge / tunnel in Pottsville, Pennsylvania. Completed plans call for site work for a bridge / tunnel.

Contractor and subcontractors must be PennDOT pre-qualified to complete the work under this contract. Each proposal shall be accompanied by a bidder's bond, or certified check or cashier's check, payable to COUNTY OF SCHUYLKILL, in the amount of not less than ten percent of the total amount bid. The County reserves the right to waive any informality in and to accept or reject any and all bids. No bid may be withdrawn for a period of sixty (60) days. Bidders must submit with their bids the non-collusion affidavit contained in the contract documents. All Questions must be submitted through the PennBid website and are due by 11:00 a.m. on Friday, August 14, 2020 PA Prevailing wages will apply to this contract. The contract documents contain requirements addressing prevailing labor wage rates, labor standards, nondiscrimination in hiring practices, and related matters. The Contractor will be required to comply with the Provisions of the Pennsylvania Human Relations Act in providing equal employment opportunities in connection with all work. This bid is for a public works contract and bidder is therefore subject to the provisions, duties, obligations and penalties of the Public Works Employment Verification Act, 43 P.S. 167.1-167.11. All submitted bids shall be accompanied with the Public Works Employment Verification Form. The bidders must submit documentary evidence of minority and or women business enterprises that have been contacted and to whom commitments have been made. Documentation of such solicitations and commitments shall be submitted concurrently with the bid (Form DCED-CCD-286). Failure to submit this form will render the bid non-responsive and therefore result in rejection of the bid. The scope of the project includes the removal of the existing bridge and the construction of precast concrete arch structure. Additionally, the project will include approximately 130 feet of roadway reconstruction and approach guiderail installation. The other major items of work include temporary stream diversion devices, traffic control, utility coordination, inspections, and erosion & sedimentation control.

Award

Bridges / Tunnels

$425,568.00

Public - City

Paving, Site Work

27

1

4

8

Subscribe For Documents

85 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work Covered by Contract Documents, Price and Payment Procedures, Unit Prices, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Joint Protection, Joint Sealants
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Flexible Paving, Asphalt Paving, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
135
Bidding Soon
1,754
All Active Projects
805
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 17, 2020

October 19, 2020

img_map_placeholder

To Be Determined, Pottsville, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Bridge No. 67 Structure Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.