BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Boring, Oregon. Working plans call for site work for a water / sewer project.

**As of 10/19/2020 project will put on a rebid. No rebid date yet. Estimated Project Total: $70,000.00 - $90,000.00. All questions regarding this RFQ are to be directed to the Procurement Analyst Kim Randall. Quoters may not communicate with County employees or representatives about the RFQ during the procurement process until the Procurement office has notified Quoters of the selected Quoter. Communication in violation of this restriction may result in rejection of a Quoter. Completion: April 30, 2021 SCOPE Background: Clackamas County Parks is seeking a qualified contractor to drill and install a new potable water well at Barton Park in the Day-Use area as well as cap and fill two (2) existing shallow wells. The new well will be used for supplying drinking water and other recreational uses (e.g. restroom fixtures, picnic shelter sinks) in the park Day-Use area, and may also be used for irrigation in the East Campground. The nearby Barton West well (CLAC 70813) was drilled to 762 feet. The well log indicates the driller hit the basalt aquifer at 682 feet. The location for this new well is approximately 1,400 feet away from the Barton West well, at a location approximately 30 feet lower in elevation. The existing pump house in the Day-Use area has a 3-phase power service. Scope of Work: Contractor to perform all work necessary to install a well capable of producing approximately 80 gallons per minute ("gpm") in accordance with the State of Oregon Well Construction Standards, connection and testing of the well and control systems, and site cleanup as identified in the following: The well shall be drilled, cased and sealed down through the Troutdale aquifer, and into the basalt aquifer to avoid hydraulic connection with the Clackamas River, in order to be eligible for a water rights within 1/4 mile of the river. The well shall be constructed to develop water from a single basalt aquifer, and have no more than 100 feet of open interval in the basalt.

Final Planning

Water / Sewer

$90,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
59
Bidding Soon
1,055
All Active Projects
383
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2020

April 19, 2021

img_map_placeholder

19009 SE Barton Park Rd, Boring, OR

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.