BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Cold Spring, Minnesota. Completed plans call for site work for a water / sewer project.

The Bidders Shall Submit the Proposal Guarantee Electronically by the Date and Time Set for Opening Proposals. Bidders Shall File an Original Hard Copy of the Proposal Guaranty With the City Within 48 Hours After the Date and Time for the Opening of Proposals. The Owner Reserves the Right to Retain the Deposits of the 3 Lowest Bidders for a Period Not to Exceed 60 Days After the Date and Time Set for the Opening of Bids. No Bids May Be Withdrawn for a Period of 60 Days After the Date and Time Set for the Opening of Bids Well No. 8 & No. 9 13.8kv Overhead Distribution Line in General, Work Consists of Overhead Power Line Construction. The Project Consists of the Following Approximate Quantities: 23 Each Wood Power Poles and Appurtenances (35 to 45 Feet Tall) 17,000 Lin Ft Conductor and Neutral Wire 6 Each Single Phase Transformer, 100 Kva, 13.8 Kv - 480/208 V Along With Miscellaneous Electrical Components and Installation, Restoration, and Correlated Appurtenances. Bid Security in the Amount of 5 Percent of the Amount of the Bid Must Accompany Each Bid in Accordance With the Instructions to Bidders. The Successful Bidder Must Be a responsible Contractor. the Term "responsible Contractor Means a Contractor as Defined in Minnesota Statutes Section 16c.285, Subdivision 3. Any Prime Contractor, Subcontractor, or Motor Carrier That Does Not Meet the Minimum Criteria or Fails to Comply With the Verification Requirements is Not a Responsible Contractor and is Not Eligible to Be Awarded a Construction Contract for the Project or to Perform Work on the Project. A Prime Contractor, Subcontractor, or Motor Carrier That Makes a False Statement Under Oath Verifying Compliance With the Minimum Criteria Will Be Ineligible to Be Awarded a Construction Contract on the Project and the Submission of a False Statement May Result in Termination of a Contract Awarded to a Prime Contractor, Subcontractor, or Motor Carrier That Submits the False Statement. A Prime Contractor Shall Include in Its Verification of Compliance a List of All of Its First-tier Subcontractors That It Intends to Retain for Work on the Project. Before Execution of a Construction Contract, a Prime Contractor Shall Submit a Supplemental Verification Under Oath Confirming That All Subcontractors and Motor Carriers That the Prime Contractor Intends to Use to Perform Project Work Have Verified to the Prime Contractor, Through a Signed Statement Under Oath by an Owner or Officer, That They Meet the Minimum Criteria for a Responsible Contractor

Award

Water / Sewer

$293,080.00

Public - City

Site Work

16

1

6

6

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
41
Bidding Soon
700
All Active Projects
304
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2020

September 21, 2020

img_map_placeholder

Multiple Locations, Cold Spring, MN

Related To This Project


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.