Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Cold Spring, Minnesota. Completed plans call for site work for a water / sewer project.
The Bidders Shall Submit the Proposal Guarantee Electronically by the Date and Time Set for Opening Proposals. Bidders Shall File an Original Hard Copy of the Proposal Guaranty With the City Within 48 Hours After the Date and Time for the Opening of Proposals. The Owner Reserves the Right to Retain the Deposits of the 3 Lowest Bidders for a Period Not to Exceed 60 Days After the Date and Time Set for the Opening of Bids. No Bids May Be Withdrawn for a Period of 60 Days After the Date and Time Set for the Opening of Bids Well No. 8 & No. 9 13.8kv Overhead Distribution Line in General, Work Consists of Overhead Power Line Construction. The Project Consists of the Following Approximate Quantities: 23 Each Wood Power Poles and Appurtenances (35 to 45 Feet Tall) 17,000 Lin Ft Conductor and Neutral Wire 6 Each Single Phase Transformer, 100 Kva, 13.8 Kv - 480/208 V Along With Miscellaneous Electrical Components and Installation, Restoration, and Correlated Appurtenances. Bid Security in the Amount of 5 Percent of the Amount of the Bid Must Accompany Each Bid in Accordance With the Instructions to Bidders. The Successful Bidder Must Be a responsible Contractor. the Term "responsible Contractor Means a Contractor as Defined in Minnesota Statutes Section 16c.285, Subdivision 3. Any Prime Contractor, Subcontractor, or Motor Carrier That Does Not Meet the Minimum Criteria or Fails to Comply With the Verification Requirements is Not a Responsible Contractor and is Not Eligible to Be Awarded a Construction Contract for the Project or to Perform Work on the Project. A Prime Contractor, Subcontractor, or Motor Carrier That Makes a False Statement Under Oath Verifying Compliance With the Minimum Criteria Will Be Ineligible to Be Awarded a Construction Contract on the Project and the Submission of a False Statement May Result in Termination of a Contract Awarded to a Prime Contractor, Subcontractor, or Motor Carrier That Submits the False Statement. A Prime Contractor Shall Include in Its Verification of Compliance a List of All of Its First-tier Subcontractors That It Intends to Retain for Work on the Project. Before Execution of a Construction Contract, a Prime Contractor Shall Submit a Supplemental Verification Under Oath Confirming That All Subcontractors and Motor Carriers That the Prime Contractor Intends to Use to Perform Project Work Have Verified to the Prime Contractor, Through a Signed Statement Under Oath by an Owner or Officer, That They Meet the Minimum Criteria for a Responsible Contractor
Award
Water / Sewer
$293,080.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 20, 2020
September 21, 2020
Multiple Locations, Cold Spring, MN
Related To This Project
Cold Spring, MN
Bid Date: Jul 10 2020
Cold Spring, MN
Bid Date: Mar 27 2019
Cold Spring, MN
--
Cold Spring, MN
Bid Date: Sep 05 2024
Cold Spring, MN
--
Cold Spring, MN
--
Cold Spring, MN
Bid Date: May 21 2024
Cold Spring, MN
Bid Date: May 23 2024
Cold Spring, MN
Bid Date: Mar 21 2024
Cold Spring, MN
Bid Date: Mar 21 2024
Cold Spring, MN
Bid Date: Nov 23 2020
Cold Spring, MN
Bid Date: Jul 09 2021
Cold Spring, MN
Bid Date: Feb 13 2024
Cold Spring, MN
Bid Date: Nov 01 2023
Cold Spring, MN
Bid Date: Jan 06 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.