BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Simi Valley, California. Design plans call for site work for a water / sewer project.

This project would recoat the interior of the 2 Million gallon capacity Walnut Tank No 2 The tank was constructed in 1992 and the interior was last patch repaired in 2001. A dive inspection conducted by CSI Services in 2011 identified that the tanks interior original coating had deteriorated. Tank longevity is significantly improved, cost effectively by recoating. In addition, the Waterworks Facilities Assessment conducted by Carollo Engineers in 2015 recommended to replace the cathodic protection system which has been in service for 26 years. A Seismic Evaluation completed by Kenndy Jenks in January 2021 recommends to lower the overflow inlet by 3 feet to lower the seismic hoop tensile stress on the lowest shell ring and raise the tank roof by 4 feet to increase freeboard to prevent damage to the roof and shell during an earthquake. Additional funding in the amount of 400,000 is estimated for the seismic mitigation. Design to be completed in July 2022 and construction expected to be completed in January 2023. Project is included in the City of Simi Valley's FY 2022 - 2027 CIP. Per the owner, as of July 13, 2022, the design for this project is being done in-house. A timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Water / Sewer

$350,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
86
Bidding Soon
1,888
All Active Projects
820
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2022

img_map_placeholder

Walnut Ave, Simi Valley, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.