BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 24, 2020 at 8:00 PM

Updated January 26, 2024

Site work and renovation of a water / sewer project in Murrieta, California. Completed plans call for the renovation of a water / sewer project.

This project includes constructing a 2.0 MG welded steel potable water storage tank located at 29527 Via Las Palmas 1 mile north of Ramon Road in an unincorporated area of Riverside County known as Thousand Palms. Reservoir Site Work: The reservoir site work shall consist of all utility location and verification (excavating, exposing, and verifying top, bottom, and side of utility facility); earthwork and site work including excavating, importing, exporting, trenching, scarifying, backfilling, placing, filling, compacting, and grading all soil and rock materials onsite; restoring all areas not intended to be altered to pre- construction conditions (inside and outside project limits); transporting offsite all vegetation and deleterious material; furnishing and installing site piping and all related work; leakage and pressure testing pipelines; protecting in place or removing and replacing all existing utilities and public and private improvements; constructing storm drains, V-ditches, drainage swales, concrete inlets and outlets, rock rip-rap, and all drainage facilities; furnishing and installing crushed miscellaneous base; furnishing and installing site fencing, gates, and appurtenances; furnishing and installing all electrical service equipment, electrical panels, instrumentation and controls, lighting, conduit, and conductors; and all related work. Steel Reservoir Work: The reservoir work shall consist of furnishing and erecting one (1) new 2.0 MG welded steel potable water storage reservoir with appurtenances; furnishing all design calculations and fabrication drawings; furnishing and installing protective coatings on all interior and exterior surfaces of the reservoir, including piping, appurtenances, and miscellaneous metal; shop and field testing; constructing reinforced concrete ringwall and related asphalt sand and clean sand foundation beneath reservoir; furnishing and installing reservoir inlet and outlet piping; furnishing and installing reservoir drain and overflow piping; leakage and pressure testing pipelines; and all related work. Estimated Value: $2000000-$2500000 Bid: 10% Payment: 100% Performance: 100% Liquidated Damages: $500.00 per calendar day License Requirements: Class A Start/Delivery Date: November 2020 Project Duration: 300 Calendar Days. Online Q&A: Yes Q&A Deadline: August 26, 2020 5:00PM

Award

Water / Sewer

$2,463,038.00

Public - County

Renovation, Site Work

25

1

4

4

Subscribe For Documents

79 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
643
Active Projects
272
Bidding Soon
3,612
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2020

December 1, 2020

Project location map

29527 Via Las Palmas, Murrieta, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.