BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Capon Bridge, West Virginia. Completed plans call for site work for a road / highway.

The approximate quantities of work to be bid upon are described as follows: Construction of 465 LF of Industrial Access Road. The total project will consist of 4,354 CY of excavation. The Industrial Access Road construction will include 103 CY of shoulder stone, 91 TN of wearing course, 169 TN of Marshall HMA Type 2 Base course, 216 CY of Open graded free draining base course, 1,002 LF of edge lines and 450 LF centerlines, Type II. The Work will be substantially completed within 90 calendar days after the date when the Contract Times commence to run and completed and ready for final payment within 120 days after the date when the Contract Times commence to run. Liquidated damages shall be $1,000.00 per day. Bidding Documents also may be examined at Hampshire County Development The Thrasher Group, Inc. Authority 600 White Oaks Boulevard 91 South High Street Bridgeport, WV 26330 Romney, WV 26751 Bids shall be accompanied by a certified check or bid bond payable to Hampshire County Development Authority, in an amount equal to five percent (5%) of the base bid. A two envelope system will be used. Envelope No. 1 must have the following information presented on the front: Name and address of Bidder Bid on Contract Capon Bridge Technology Park Industrial Access Road Received by the Hampshire County Development Authority Envelope No. 2 labeled "Bid Proposal" shall also be placed inside of Envelope #1. Envelope No. 1 will be opened first and the Bid Opening Requirement items checked for compliance as outlined on the Bid Opening Checklist on page BOR - 1 of these contract documents. If such documents are found to be in order, Envelope No. 2 "Bid Proposal", will then be opened and will be publicly read aloud. If the documents required to be contained in Envelope No. 1 are not in order, Envelope No. 2 "Bid Proposal" will not be opened and the Bid will be considered nonresponsive and will be returned to the Bidder. The Hampshire County Development Authority reserves the right to reject any and all bids.

Award

Roads / Highways

$375,772.00

Public - County

Paving, Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
39
Bidding Soon
995
All Active Projects
414
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2020

October 15, 2020

img_map_placeholder

414 Smokey Hollow Rd, Capon Bridge, WV

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.