BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2020 at 8:00 PM

Updated May 1, 2024

Renovation of a transportation facility in East Palo Alto, California. Completed plans call for the renovation of a transportation facility.

The work consists of all labor, materials, tools, equipment, etc. for the scope of work listed in these specifications and the construction drawings. A. Sign onto and pick up electrical permit card from the Development Center at 285 Hamilton Avenue. City is responsible for and has already paid the electrical permit fees. Permit number is 19000-01579. B. Coordinate power shutdown with the Utilities Department. Utilities will be responsible for the replacement of the existing 75KVA transformer with a new 225 KVA transformer. C. Contractor shall have three continuous days for the power shutdown. D. Contractor shall supply generator power during the power shutdown for the following panels: o 200 amp 3 phase panel B o 125 amp 3 phase panel C o 200 amp 3 phase panel for Abundant Air restaurant o 200 amp 3 phase panel in Aero Works' hanger. E. In the switchgear, replace the existing 200 amp breaker with a new 400 amp breaker. The goal is to reenergize the switchgear as soon as possible so permanent power can be restored to panels B & C. F. Complete panel replacements as per drawings and specifications. G. Contractor is responsible for scheduling and coordinating all inspections with Palo Alto Building Department. Q/A Deadline - August 31, 2020 03:00 PM (Pacific)

Bid Results

Transportation Terminals

$50,375.00

Public - City

Renovation

10

14

10

5

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
326
Active Projects
125
Bidding Soon
2,755
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2020

October 5, 2020

Project location map

1901 Embarcadero Rd, East Palo Alto, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.