Published September 15, 2020 at 8:00 PM

Updated October 1, 2024

Site work and renovation of a water / sewer project in Millington, Tennessee. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The work consists generally of replacement of six existing screw pumps with three submersible pumps, pump controls, and discharge piping and valves. Also included will be the provision, installation, operation and maintenance of a temporary bypass pump system capable of handling flows up to 15 MGD, the removal and disposal of the six existing screw pumps, all necessary structural demolition, modification and reinforcement of the existing concrete wet well structure to facilitate the installation of these new submersible pumps, electrical work, site restoration and all other necessary and appurtenant work required to complete the work as described in these specifications and detailed in the drawings. A certified check or bank draft, payable to the City of Millington, or a satisfactory Bid Bond executed by the Bidder and an acceptable surety, in an amount equal to five percent (5%) of the total of Bid, shall be submitted with each Bid. Any Bidder, upon written request, will be given permission to withdraw his Proposal not later than the time set for opening. Bids accepted and read will remain effective for a period of sixty (60) days after the date and time set for the opening of such bid. The City of Millington is an equal opportunity affirmative action employer, drug-free with policies of non-discrimination on the basis of race, sex, religion, color, national or ethnic origin, age, disability or military service. The City of Millington reserves the right to reject any or all bids in whole or in part, with or without cause; and to accept the lowest bid per location which in its judgement will be for the best interest of the City of Millington

Award

Water / Sewer

$1,683,800.00

Public - City

Renovation, Site Work

23

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Unit Prices, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Temporary Facilities and Controls, Vehicular Access and Parking, Haul Routes, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 08 - Openings

Division 08 - Openings

Doors and Frames
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, High-Performance Coatings
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Watering, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Sanitary Sewerage Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
36
Bidding Soon
406
All Active Projects
178
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2020

October 12, 2020

img_map_placeholder

To Be Determined, Millington, TN

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Influent Pump Station Improvements Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.