EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 22, 2020 at 8:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Florham Park, New Jersey. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

**As of October 22, 2020, the project has been awarded to Jo-Med Contracting Corp. for $200,087.45.** Estimated cost of the project is $450K - $650K The Project Generally Consists of Road Improvements to Approximately 1,050 Lf of Existing Roadway From Columbia Turnpike Northwesterly to the Lower Park Street Dead End. The Roadway Improvement Work Generally Consists of Roadway Excavation, Re-grading and Re-profiling, Partial Road Widening, Tree Removal, Granite Block Curb Installation, Water Curb Box and Sanitary House Cleanout Relocation, Reset Manhole Castings, Possible Inlet Construction, Installation of Rip-rap Stone Channel Protection, Driveway Repairs at Curb Installation Locations, Dense Aggregate Base Course Installation, Partial Full Depth Pavement Re-construction, Pavement Milling, Base Course and Surface Course Layers of Hot Mix Asphalt Pavement; Reflective Traffic Striping and Pavement Reflector Installation, Sign Installation, and Other Incidental Work, All in the Borough of Florham Park in Accordance With the Form of Proposal, Contract and Specifications Prepared by the Borough's Engineering Consultant, Greenman-pederson, Inc. The Njdot 2019 Standard Specifications for Road and Bridge Construction, and as Amended Herein, Shall Govern the Construction of This Project. Payment Must Be in the Form of Cash, Certified Check, or Money Order Made Out to the Borough of Florham Park. Bids Must Be Sealed in an Envelope and Plainly Marked With the Name of the Contract and Contract Number; and Shall Contain the Name and Address of the Bidder on the Envelope. The Sealed Bid Must Be Addressed to the Borough Clerk of Florham Park at the Borough Hall Address. Bidders Are Notified That They Must Comply With the New Jersey Prevailing Wage Act (Chapter 150 of the Laws of 1963, as Amended)(N.j.s.a. 34:11-56.25, Et. Seq.) and That Award Will Not Be Made to Any Bidder Whom the Commissioner of Labor and Industry Does Not Certify. Bids Shall Be Submitted on the Forms Provided, in the Manner Designated Therein and Required by the Specifications. They Must Be Accompanied by a Certified Check, Cashier's Check, or Bid Bond on the Form Provided of Not Less Than 10% of the Amount of Bid. Said Check or Bid Bond May Not Be Less Than $500 Nor Shall It Be More Than $20,000 and Must Be Accompanied by a Consent of Surety Statement in the Form Provided From a Surety Company Stating That the Surety Company Will Provide the Bidder With a Bond for 100% of the Contract Amount in the Event That the Contract is Awarded to the Bidder. A Non-collusion Affidavit and a Record of Recent Contract Awards Must Also Accompany the Proposal on the Forms Provided. Any Bid Addenda Will Be on the Borough portal, and Processed in Accordance With N.j.s.a. 40a:11-23(C)(1). All Interested Bidders Should Check the portal From Now Through Bid Opening. It is the Sole Responsibility of the Respondent to Be Knowledgeable of All Addenda Related to This Procurement. Bidders Shall Comply With the Requirements of N.j.s.a. 10:5-31 and N.j.a.c. 17-27 Et Seq. Proposals Must Be Submitted Upon the Blank Forms Provided or May Be Attached to the Applicable Blank Forms. Proposal Forms Shall Be Submitted in the Same Order as Organized in the This Specification Document. Bidders Must Have at the Time of Bid, a Business Registration Certificate Issued by the New Jersey Department of Treasury. Bidders Are Required to Comply With the Requirements of P.l. 1975 Chapter 127. Bidders Are Further Required to Comply With the Requirements of N.j.s.a. 10:5-31 Et Seq. And N.j.a.c. 17:27 for an Affirmative Action Program for Equal Employment Opportunity. If Awarded a Contract, Your Company/firm Will Be Required to Comply With the Requirements of N.j.s.a. 10:5-31 Et Seq. And P.l. 1975 C. 127 (N.j.a.c. 17:27-1, Et Seq.). The Contract for This Project is Governed by the Provisions of the Local Public Contracts Law, N.j.s.a. 40a: 11-1 Et Seq. Bidders Must Also Comply With the Requirements of P.l. 1977, Chapter 33 Amending the Local Public Contracts Law. Bidders Must Submit a Statement in Accordance With N.j.s.a. 52:25-24.2 of All Owners of the Corporation Setting Forth the Names and Addresses of All the Stockholders in the Corporation or Members of the Partnership Who Own Ten Percent (10%) or More of Its Stock, or Have a Ten Percent (10%) or Greater Interest in the Case of Partnership. No Bid May Be Withdrawn for Sixty (60) Days After the Opening of Bids. A Contract Will Be Awarded to the Lowest Responsible Bidder, or All Proposals Will Be Rejected Within Sixty (60) Days After the Opening of Bids. The Borough of Florham Park Reserves the Right to Delete Sections of Work From the Contract After the Award of the Bid Has Been Made Due to Funding or Other Reasons. The Prices Bid for Various Items of Work Shall Not Be Adjusted Due to the Deletion of Any Work and Due to the Variation of Any Quantity for the Various Items Scheduled in the Proposal. Proposals for This Contract Will Be Accepted Only From Bidders Who Have Been Properly Qualified in Accordance With the Requirements of the Specifications. The Mayor and Borough Council of the Borough of Florham Park Reserve the Right to Reject Any or All Bids, to Reject Unbalanced Bids, to Waive Any Informality Therein in Any Bid, and to Accept Any Bid That Will Be in the Best Interest of the Borough of Florham Park According to N.j.s.a. 40a:11-1.

Award

Roads / Highways

$200,087.00

Public - City

Paving, Site Work

15

1

2

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Unit Prices, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Erection, Cleaning and Waste Management
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Gratings
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Watering, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts, Manufacturing Equipment, Machining Equipment, Milling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
545
Active Projects
333
Bidding Soon
4,836
All Active Projects
2,212
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2020

October 15, 2020

img_map_placeholder

Park St, Florham Park, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Park Street Road Improvement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.