BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2020 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in South Gate, California. Completed plans call for site work for a water / sewer project.

The Work consists of furnishing and installation of pump, electric motor, column pipes, level sensor, airline, and electrical wiring at City of South Gate Well No. 19. The well pump, discharge head, and column pipes that were installed at this location have already been removed by the City. Also includes, sand blasting and epoxy coating of existing discharge head prior to installation, well disinfection, airline and pressure gauge, replacing pre-lube valves, camera port, and at the project site.

Award

Water / Sewer

$117,630.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
607
Active Projects
253
Bidding Soon
3,559
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 5, 2020

November 4, 2020

Project location map

9615 Pinehurst Ave, South Gate, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.