Renovation of a power facility in Belmont, Massachusetts. Completed plans call for the renovation of a power facility.

Repair of exterior envelope and replacement of selective exterior components. General bidders must submit DCAMM Certifications. All requests for clarification must be submitted to CHA Consulting no later than five days prior to the respective bid deadlines. MBE: 7.4% WBE: 4% The name of the project on the Contract Documents is Belmont Fire Substation Building Envelope Repairs, Belmont, Massachusetts. The goal of the project is to stop water leakage through several areas of the building envelope and for the repairs to be durable, reliable, and low maintenance. B. Work will be performed on the roofs, penthouses, and exterior walls of the Fire Substation, and will require access from both the interior and exterior of the building. The building will be occupied and in use by the Owner for the duration of the project; all work must be closely coordinated with the Owner's Representative. C. The Work contemplated by the Contract Documents includes the Work of all trades required and all labor, equipment, materials, and supervision necessary and incidental to the Work indicated. The following description of the Work represents a brief summary of the project. For additional and more-complete information, refer to the Drawings and Specifications. Removal of glazed aluminum storefronts and replacement with glazed aluminum curtain walls, and reconstruction of perimeter flashings and sealants. Removal and reinstallation of aluminum windows and reconstruction of perimeter flashings and sealants. Selective removal of gypsum wallboard, venetian blinds, and particle board sills at fenestration openings as needed to allow the aforementioned work to be completed. Reinstallation of particle board sills. Remove, reinstall, and provide new granite cladding. Remove CMU backup wall and construct a brick masonry backup wall. Remove and reinstall granite watertable. Demolish and reconstruction concrete sidewalk. Excavate and backfill, as needed to installed below-grade waterproofing. Removal and replacement of hollow metal roof access door, and reconstruction of perimeter flashings and sealants.

Award

Power Plant

$975,100.00

Public - City

Renovation

44

18

2

6

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
367
Active Projects
229
Bidding Soon
2,880
All Active Projects
1,309
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2020

November 9, 2020

img_map_placeholder

99 Leonard St, Belmont, MA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.