BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Belmont, Massachusetts. Completed plans call for site work for a bridge / tunnel.

Winn's Brook Culvert Inlet Structure Replacement. New 17'x12' concrete structure with 10'x10' galvanized steel debris grate. Remove and dispose of existing grate and 48" RCP sections. Winter construction required with substantial completion by 4/1/23. Replacement of 2,400 feet of water main and transfer of water services in Belmont MA Construction of new concrete wing wall structure and galvanized steel debris grate. Installation of new chain link fence, temporary paving and appurtenances. Repoint existing stone stream channel walls. Stream flows must be maintained at all times. Removal and disposal of existing debris grate, fencing and planter. Construction shall be fully completed within 150 calendar days from the stated date set in the Notice to Proceed. Milestone 1 for completion of the concrete structure is March 1, 2023. Milestone 2 for completion of the galvanized steel debris grate is April 1, 2023. Every request for such interpretation should be in writing (typed, not handwritten) addressed to Weston & Sampson Engineers, Inc., 55 Walkers Brook Drive, Reading, Massachusetts 01867 Attention: CSD, or sent via email to Carolyn Mahoney at mahoney.carolyn@wseinc.com and to be given consideration must be received at least ten working days prior to the date fixed for the opening of bids

Post-Bid

Bridges / Tunnels

$150,000.00

Public - City

Site Work

8

13

7

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
322
Active Projects
177
Bidding Soon
2,861
All Active Projects
1,191
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2022

January 2, 2023

img_map_placeholder

Multiple Locations, Belmont, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.