BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 16, 2020 at 8:00 PM

Updated July 12, 2025

Site work for a water / sewer project in Zia Pueblo, New Mexico. Working plans call for site work for a water / sewer project.

The base bid project consists of construction and tie-in of a 24" irrigation transmission line of 624 linear feet of pipe, construction of a river aerial crossing consisting of structural concrete, 30" drilled shaft foundation, and prefabricated steel truss, stabilization of the Jemez River bank at the aerial crossing, construction of a winged headwall, and demolition of the existing 24" line of 624 linear feet, existing winged headwall, existing aerial crossing pile, and existing substructure concrete. The project is located 2.5 miles northwest of the Pueblo of Zia proper in Zia Pueblo, New Mexico. The irrigation transmission line begins at the same location of the outlet distribution box at the Zia Lake impoundment. The line proceed to the southwest, aerially crosses the Jemez River and ends at the same location of a concrete headwall downstream. Additive Alternate 1 consists of the construction of an additional 24" ductile iron irrigation transmission line of 1,594 linear feet of pipe and demolition of the existing 24" line of 1,594 linear feet. Additive Alternate 2 includes cured in place pipe lining of 175 linear feet of 24" irrigation transmission line. All work shall be completed in accordance with the New Mexico APWA Standard Specifications for Public Works Construction latest edition, the New Mexico State Department of Transportation Standard Specifications for Highway and Bridge Construction latest edition, and the latest applicable local, state, and federal codes. Owner will select the most responsive, responsible low bidder based on the Base Bid plus Additive Alternate #1, and consideration of other additive alternate bids that serve the best interest of the Owner. The owner reserves the right to reject all bids. The Work will be substantially completed on or before April 1 st 2021 and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before May 1st 2021

Final Planning

Water / Sewer

$600,000.00

Public - City

Site Work

23

1

4

8

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
24
Bidding Soon
253
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2020

October 28, 2020

Project location map

To Be Determined, Zia Pueblo, NM

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.