BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a medical facility in San Diego, California. Completed plans call for the renovation of a medical facility.

Project involves the installation of a new medical vacuum system and new medical air system serving the original Thornton Hospital. Systems are replacing the original facility systems. Estimated project duration is 240 calendar days. Participants shall meet at UCSD Medical Center - La Jolla, 9300 Campus Point Dr, La Jolla, CA 92037, Thornton Loading Dock. For directions to the Pre-Bid Conference/Job Walk contact Kurt Schwarm, project manager, at kschwarm@ucsd.edu or 858-534-6388. UC San Diego maps can be found at electroniocally. Attendees should plan to arrive in ample time to secure parking prior to the scheduled meeting time. Bid Security in the amount of ten percent (10%) of the Lump Sum Base Bid, excluding alternates, shall accompany each Bid. The Surety issuing the Bid Bond shall be, on the Bid Deadline, listed in the latest published State of California, Department of Insurance, list of Insurers Admitted to Transact Surety Insurance in This State. The successful Bidder will be required to have the following California current and active contractor's license at the time of submission of the Bid: B, GENERAL BUILDING CONTRACTOR. UC San Diego encourages the participation of Small, Disadvantaged, Minority-owned, Women-owned and Service/Disabled Veteran-owned Business Enterprises (S/D/M/W/DVBE's) and is committed to promote a diverse pool of firms for our building programs.

Bid Results

Medical

$720,916.00

Public - State/Provincial

Renovation

19

19

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
64
Bidding Soon
1,059
All Active Projects
481
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2021

April 12, 2021

img_map_placeholder

9300 Campus Point Dr, San Diego, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.