BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 3, 2025 at 7:00 PM

Updated January 16, 2025

This is a service / maintenance or supply contract in San Diego, California. Contact the soliciting agency for additional information.

The City of San Diego (City), Public Utilities Department (PUD) is seeking a qualified vendor to provide a full-service odor control management program (Program) that includes equipment systems and installation, inventory management, storage and delivery logistics, sampling, service monitoring and maintenance, on-going technical and applications support, rate tracking and reporting, performance goal monitoring, and chemical supply of Ferrous Chloride (FeCl2) and Hydrogen Peroxide (H2O2) at designated pump stations and wastewater plants to optimize the wastewater odor control treatment process. Online Q&A Yes Q&A Deadline 10/31/2024 12:00 PM (PDT) Project Type RFP (Request for Proposal) Response Types Line Items Response File General Attachment Type of Award Lump Sum

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
99
Bidding Soon
1,325
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2025

February 14, 2025

Project location map

Multiple Locations, San Diego, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.