Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 24, 2021 at 8:00 PM
Updated October 15, 2024
Demolition, site work, paving and new construction of a bridge / tunnel in Erlands Point-Kitsap Lake, Washington. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
As of March 24, 2021, information regarding award and award date have not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to September of 2021. *The closed solicitation has been included below for reference: NW Taylor Road Bridge Removal and New Bridge Design The work to be performed by the Consultant consists of preparing the design and ultimately the Plans, Specifications, and Estimate (PS&E) for constructing a new bridge superstructure on NW Taylor Road over Chico Creek. The general scope of work for the project includes design and PS&E for a bid ready project, addressing the following major features/challenges of the project: Creating a demolition plan for the existing steel bridge Creating a plan for property access control/management during demolition and construction that allows for resident and business access west of the Taylor Road Bridge Protection of habitat at Chico Creek Design of a new bridge with concrete girders utilizing the existing substructure The County reserves the right and holds at its discretion the following rights and options: to waive any or all informalities in any SOQ. to reject any or all responses. to issue subsequent requests. Questions regarding this project should be directed to Gary Kaczynski, P.E., Capital Improvements Project Manager, at 360.337.4689. The method of contractor selection has not been determined at this time. Request for proposals for design services is underway
Conceptual
Bridges / Tunnels
$1,000,000.00
Public - County
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 6, 2021
NW Taylor Rd, Erlands Point-Kitsap Lake, WA
Related To This Project
Kingston, WA
--
Kingston, WA
Bid Date: Mar 16 2021
Mount Vernon, WA
Bid Date: Nov 20 2024
Port Orchard, WA
Bid Date: Jan 31 2022
Port Orchard, WA
Bid Date: Feb 25 2021
Everson, WA
--
Bremerton, WA
Bid Date: Oct 16 2024
Ridgefield, WA
Bid Date: Oct 30 2024
Burlington, WA
Bid Date: Mar 28 2025
Lynnwood, WA
Bid Date: Oct 29 2024
Kennewick, WA
Bid Date: Oct 07 2025
Washougal, WA
Bid Date: Nov 13 2024
Lyle, WA
Bid Date: Nov 18 2024
Kennewick, WA
Bid Date: Oct 31 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
