BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 24, 2021 at 8:00 PM

Updated October 15, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Erlands Point-Kitsap Lake, Washington. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of March 24, 2021, information regarding award and award date have not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to September of 2021. *The closed solicitation has been included below for reference: NW Taylor Road Bridge Removal and New Bridge Design The work to be performed by the Consultant consists of preparing the design and ultimately the Plans, Specifications, and Estimate (PS&E) for constructing a new bridge superstructure on NW Taylor Road over Chico Creek. The general scope of work for the project includes design and PS&E for a bid ready project, addressing the following major features/challenges of the project: Creating a demolition plan for the existing steel bridge Creating a plan for property access control/management during demolition and construction that allows for resident and business access west of the Taylor Road Bridge Protection of habitat at Chico Creek Design of a new bridge with concrete girders utilizing the existing substructure The County reserves the right and holds at its discretion the following rights and options: to waive any or all informalities in any SOQ. to reject any or all responses. to issue subsequent requests. Questions regarding this project should be directed to Gary Kaczynski, P.E., Capital Improvements Project Manager, at 360.337.4689. The method of contractor selection has not been determined at this time. Request for proposals for design services is underway

Conceptual

Bridges / Tunnels

$1,000,000.00

Public - County

Demolition, New Construction, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
1
Bidding Soon
1,077
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 6, 2021

Project location map

NW Taylor Rd, Erlands Point-Kitsap Lake, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.