BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation and addition to an educational facility in Lloydminster, Alberta. Completed plans call for the renovation of a educational facility; and for the addition of a 28,350-square-foot, two-story above grade educational facility.

1. The facility will consist of an approximate addition area of 2,625m2 and 200m2 of renovation area. 2. The project will include the expansion and renovation of Holy Rosary High School, located in the established neighborhood of Parkview in Lloydminster, AB. Holy Rosary is surrounded by residences in three (3) directions and by street frontage of Ecole St. Thomas school in the fourth direction. The existing multi-story school, utilized for students from Grades 8-12 is approximately 8,740 square meters (94,076 sq. ft.), and was designed for an enrollment of 750 students in the secondary core. 3. The project is expected to start construction in June 2021 with substantial performance in June 30, 2022 with opening and full occupancy by September 1, 2022. 4. The school addition and renovation is expected to be on the current site of the Holy Rosary High School. 5. Anticipated project complexities include: a. Phasing construction around active school(s) that will require any demolition or building preparation for the addition (during/before/after) construction of the school is complete. b. Maintain minimal disruption to occupants of the current active schools during the renovation and addition construction. c. An aggressive design and construction schedule with design packages that includes significant community engagement and must be completed fully by August 31, 2021. d. To ensure the new construction and renovation can be completed on budget, creative ideas for cost effective construction and renovation will be required. e. The school was originally designed to be expandable and has extra capacity within the mechanical and electrical systems that will need to be verified and utilized by the consultants. f. This school project may include several specialized spaces that are not typical. Such as: Biomechanics Lab - a lab space dedicated to the motion capture and breakdown of sports maneuvers such as baseball and golf swings to study the biomechanics of the motion. Small Motors and Metals Lab - The small motors lab will include 6 bays for motorcycles and snowmobiles. The metals lab will include millwrighting, welding, and tooling and be adjacent to the motors lab. STEM and Steam Lab - A technology lab that will focus on the three most important priorities to the Lloydminster area: soil reclamation, energy security and food security. Art and Graphic Arts Studio - The graphics arts studio will be an oversized classroom that can accommodate fine arts as well as incorporate aspects of a gallery including display of art, flexibility to rearrange and a separate securable entrance to host functions. *Structural, Mechanical and Electrical engineers have been added.

Award

Educational

$10,000,000.00

Public - State/Provincial

Addition, Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
4
Bidding Soon
68
All Active Projects
27
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 16, 2021

June 1, 2022

June 30, 2023

img_map_placeholder

6611 39 St, Lloydminster, AB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.