BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 11, 2020 at 7:00 PM

Updated January 26, 2024

Demolition, site work, renovation and addition to a water / sewer project in Eagle, Idaho. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Project contemplated is located within the property limits owned by Eagle Sewer District at 1995 West State Street, Eagle, ID 83616 and generally consists of the constructing two new aerated lagoon cells, two new settling lagoon cells, a headworks flow splitter structure, two new blowers, and modifications to two effluent pump stations. The Work will be completed in all respects within 340 calendar days from the date when the Contract Times commence to run. In the event of a technology failure, the District reserves the right to accept all proposals submitted and electronically time stamped prior to bid/proposal opening. Each Bid must be submitted on the prescribed Bid Form and accompanied by Bid security as prescribed in the Instructions to Bidders. The Successful Bidder will be required to furnish the additional bond(s) and insurance prescribed in the Bidding Documents. In order to perform Work under these Bidding Documents, Bidders and Subcontractors shall be licensed as Public Works Contractors in accordance with Idaho Code 54-1902 and shall obtain and hold such other licenses as required by Federal and local Laws and Regulations. Bids will be accepted from those Bidders only who, prior to the Bid opening, hold current licenses as Public Works Contractors in the State of Idaho. For information concerning the proposed Work, contact Neil Jenkins, telephone: (208) 383-6258. The Work will be completed in all respects within 340 calendar days 1. Preparation of project-specific Stormwater Pollution Prevention Plan documentation and updated EPA Region 10 NPDES Construction General Permit approval. 2. Installation and maintenance of erosion and sediment control best management practices. 3. Site clearing and grubbing. 4. Construction of a new headworks flow splitter box. 5. Construction of four new lagoon treatment cells (Cells 3, 4, 5, and 6) with new diffused aeration system. 6. Construction of docks for the new lagoon treatment cells. 7. Construction of two new blowers housed within the existing Blower Building with new air distribution piping. 8. Construction of new yard piping, control structures, and control instruments. 9. Effluent Pump Station 1 improvements. 10. Effluent Pump Station 2 improvements. 11. Construction of new groundwater monitoring wells. 12. Site fencing and access gates. 13. Site roadwork for connectivity to existing site access roads. 14. Quality control and testing. 15. Surface restoration of all disturbed areas. 16. Incidentals necessary to complete the Work.

Award

Water / Sewer

$6,641,590.00

Public - City

Addition, Demolition, Renovation, Site Work

67

1

11

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
34
Bidding Soon
318
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2020

December 28, 2020

Project location map

1995 W State St, Eagle, ID

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.