BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2022 at 7:00 PM

Updated October 24, 2023

Site work, paving and new construction of a bridge / tunnel in Eagle, Idaho. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The City of Eagle, Idaho is requesting bids for the construction of the SH-55, Bike/Pedestrian Bridge over the Boise River. The project includes construction of a bicycle and pedestrian bridge across the north channel of the Boise River with connections to existing pathways. The City of Eagle reserves the right to accept the bids and award a contract to the lowest responsible bidder; to postpone the acceptance of the bid and the award of the contract for a period not to exceed sixty (60) days; or to reject any and all proposals received. Site Directions: State Highway 55, Bike/Pedestrian Bridge over the Boise River, Eagle, Idaho.

Award

Bridges / Tunnels

$3,313,387.00

Public - City

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
15
Bidding Soon
297
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2022

March 31, 2022

Project location map

ID-55, Eagle, ID

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.