Published April 14, 2023 at 8:00 PM

Updated January 27, 2024

Addition to a road / highway in Grove City, Ohio. Completed plans call for the addition of a road / highway.

**As of December 1, 2020. Project has not been awarded. A Timeline for award has not been established yet. Construction of a new roadway connecting existing Columbus Street west of Broadway to a termination point to the northwest. The proposed roadway improvements will include subgrade stabilization, full-depth asphalt pavement, brick roadway, brick walks, concrete walks, landscaping and street lighting system. Construction of a new parking lot. The proposed parking lot improvements will include construction of a new dumpster enclosure, new access drives, lighting and landscaping. Extensive underground infrastructure including 24-inch and smaller storm sewers, underground stormwater storage chamber system, 8-inch waterline extension and utility duct bank are included in the scope of the improvement. Construction of a new at-grade railroad crossing and removal of the existing railroad crossing on Grant Avenue. Additional Bid 1 Construction of an additional underground stormwater storage chamber system. Additional Bid 2 Railroad crossing improvements on Southwest Boulevard. The estimated costs of construction for the work outlined in the plans and specifications for the various bids are: Base Bid: $ 2,925,000.00 Additional Bid 1: $ 260,000.00 Additional Bid 2: $ 301,000.00 installation of temporary sediment controls; demolition, clearing and grading; installation of the proposed site infrastructure; construction of the proposed roadway development; and permanent stabilization of the disturbed areas. i. Extension/Realignment of Columbus Street A. Shard Street/Brick Concept B. Local Storm Drainage C. Waterline Extension/Replacement D. Conduit Duct Bank ii. New Public Parking Lot A. Storm Drainage B. Lighting System C. Underground Detention System D. Dumpster Enclosure E. Landscaping iii. New At-Grade Rail Crossing A. Abandonment of Grant Avenue Rail Crossing iv. Additional Bid No 1 A. Second Underground Detention System v. Additional bid No. 2 A. Upgrade of At-Grade Crossing - Southwest Boulevard

Award

Roads / Highways

$2,689,868.00

Public - City

Addition

202

1

2

7

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
292
Active Projects
181
Bidding Soon
2,205
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2020

January 4, 2021

Project location map

Columbus St, Grove City, OH


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.